2
BEFORE YOU BEGIN
Please check that the carton contains all the
required parts before assembly.
Your carton should contain the following:
A
– Main Tube Assembly
B
– Hoist Tube Assembly
C
– Ground Socket and Cap
D
– Bonus Peg Bag
E
– Bonus Pegs (12 pcs)
F
– Bonus Rotary Storage Bag
G
– Bonus Sock Holder
Note: We recommend two persons to install this product
Tools and materials required for installation:
•
Medium aggregate screenings (crushed rock)
•
20kg bags of pre-mix concrete x 2
•
Wooden or metal stakes 400mm long x 3
•
Length of rope approximately 2 meters long x 3
•
Spirit Level
B
C
D
E
F
G
A