7
To avoid the risk of re, make sure to securely tighten the
terminal.
CAUTION
Never connect the AC power to the Motor (U, V, W / L, N)
terminals.
CAUTION
4.3 Parameter Calibration and Calibration Clearing
Pump calibration is done to set the running voltage and current for protection of the
pump. This is done after the successful pump installation or during pump maintenance.
Ensure the pump and all pipe network is functioning normally (including voltage and
running current) before pressing
STORE
4.3.1 Parameter Calibration for Pump A and B
Fig 5: Parameter Calibration
4.3.2 Parameter Calibration Clearing for Pump A and B
Fig 6: Parameter Calibration Clearing
Summary of Contents for SMARTCON 2
Page 1: ...SMARTCON 2 INTELLIGENT PUMP CONTROLLER Installation Operating Manual...
Page 2: ......
Page 27: ......