David Engineering & Mfg PDR MOUNTS SPM-100 Quick Start Manual Download Page 4

INSTLATION GUIDE

4

1: Install the SPM 100 onto the end of a threaded 1 ½” NPT (sold separably). See fig 2
2: Using the side locking screw, secure the pipe to the mount. See fig 3
3: To rotate the SPM100, loosen the bottom screws.  See fig 1
    Rotate to the desired viewing position and tighten the screws. 
4: A repositioning of the bottom screws may be necessary to rotate to the best viewing angle 
5: Using the 4 holes on the face of the mount, attach a PDR mount of your choice (sold separably)
6: Tilt the mount to the desired position and secure the side screws.

Fig 2

Fig 3

            1 ½”NPT 
PIPE SOLD SEPARATELY

SIDE LOCKING SCREW

Attach PDR mount here

Side screws

Reviews: