![David Engineering & Mfg PDR MOUNTS SPM-100 Quick Start Manual Download Page 4](http://html1.mh-extra.com/html/david-engineering-and-mfg/pdr-mounts-spm-100/pdr-mounts-spm-100_quick-start-manual_514532004.webp)
INSTLATION GUIDE
4
1: Install the SPM 100 onto the end of a threaded 1 ½” NPT (sold separably). See fig 2
2: Using the side locking screw, secure the pipe to the mount. See fig 3
3: To rotate the SPM100, loosen the bottom screws. See fig 1
Rotate to the desired viewing position and tighten the screws.
4: A repositioning of the bottom screws may be necessary to rotate to the best viewing angle
5: Using the 4 holes on the face of the mount, attach a PDR mount of your choice (sold separably)
6: Tilt the mount to the desired position and secure the side screws.
Fig 2
Fig 3
1 ½”NPT
PIPE SOLD SEPARATELY
SIDE LOCKING SCREW
Attach PDR mount here
Side screws