Installation of the probe
The probe has to be installed in vertical position, the electrical wire
being on top. Refer to drawing.
Yès
NO
A 15 mm hole has to be drilled on top
of the filtration pipe.
The part N°1 has to be glued on pipe
and the part N°2 has to be glued on
part N°1.
The probe is then threaded in part
N°2.
Refer to drawing.
Summary of Contents for Regulmatic
Page 2: ...FR Notice d installation d utilisation et d entretien...
Page 7: ...Pro Matic...
Page 9: ......
Page 12: ...ESP Instrucciones de instalaci n de uso y de mantenimiento...
Page 21: ...PT Instru es de instala o de uso e de manuten o...
Page 30: ...ITA Manuale d Installazione Utilizzazione e di Manutenzione...
Page 35: ......
Page 39: ...ENG Owners manual...
Page 44: ......