
PRE-INSTALLATION CHECKLIST
3
2
2 PRE-INSTALLATION CHECKLIST
This chapter can be used as a checklist to verify all the steps necessary to complete installation
of the PWR power Supply.
CAUTION:
Opening the cabinet requires a key that should be used by a
person adequately advised or supervised by an electrically skilled person
to enable him or her to perceive risks and avoid hazards which electricity
can create. Internal components guarantee an IP20 degree of protection
against direct contact.
1) Read all information in this manual before installation, paying particular attention to all
Caution and Warning notes.
2) Mount the PWR to the Station frame using the brackets and bolts provided in the package.
See par. 3.1.
SYSTEM WIRING: DC OUTPUT
3) Connect your devices to the PWR according to your application.
Barcode Scanners
Correctly connect the AS-I cabling to the PWR using the AS-I cable wiring instructions for
backbone and branch wiring. See par. 4.3.1 and your scanner manual for details. All cables
must pass through the compression connector as described in par. 4.1.
Image Based ID Readers
Connect your specific product as described in the sub-paragraph under 4.4 and the reader
manual. All cables must pass through the compression connector as described in par. 4.1.
SYSTEM WIRING: AC INPUT
4) To comply with EN60950-1:2007 par.1.7.2.2, par. 2.7.1, par 2.7.4, par. 3.4.6, and to
protect the AC input connection to the device; a disconnecting device with built in
overcurrent and earth protection shall be installed external to the equipment according to
local regulations.
According to EN60950-1:2007 par. 3.2.3; the AC input cable must have a maximum
diameter of 14mm and the conduit a max diameter of 16mm.
5) With AC line voltage OFF, wire the AC Line to the AC Line Input Terminal Block see par.