2
figure 1: Rear View (shown with TOPs)
Packaged with this unit you will find:
• TaskLink CD-ROM (software and User Manual)
• DUAL base
• 25 pin, 1:1 parallel cable, 32” long
• OPTIMA Booster
• Power Cord
• DUAL Power supply
• Calibration tool
TOPs and Production Adapters are boxed separately.
Assembly Instructions
WARNING: Electrostatic Discharge (ESD) may damage inte-
grated circuits. Do not touch circuit boards on the
unit without a suitable grounding strap (not
included). A grounding strap should also be worn at
all times while programming devices.
Installing a TOP
1. Turn the TOP upside-down and examine the pins to verify that they are
straight.
2. Holding the TOP right-side up at a 45 degree angle to the base, hook the
plastic tab of the TOP into the notch in the base. See figure 2.
3. Lower the TOP until it rests on the base, rock it gently to ensure it is in place
and press down gently (on the TOP rather than the socket).
WARNING: Damage may occur to the connector pins if they are
not properly lined up with the pin connector strip on
the base. Do not press the TOP if you meet resis-
tance. Remove the TOP and try again.
4. Turn the unit upside-down and screw the two recessed screws into each
TOP. See figure 3.
Note: If you are replacing a TOP, the programming software will need to be
restarted for it to recognize the new TOP.
Connecting the Cables
Before beginning, ensure that the power is turned off at both the programmer
and your computer.
DUAL Power Supply
OPTIMA Booster
Parallel Cable
Calibration Tool
TaskLink CD
Power Switch