•
•
•
2911
Getting Started
Pak Installation
Anv or
I
ha Dalo 1/0 progromming P0.lu; may be lnstolled and remo,ea wilh the proQrommors pow01
on: 1hls '8o1ure o
J
I
O'IV$ �'OU to retain dolO in the 29B RM-I when changing programming Pol<S. If lh9
progrornrner power is t...imed on before a R::Jk i!> installed. vou will hear a ''bcop'' until the Pok is
properly insfolled
CAUTION
Voltage tconsit.-nls con couse device
domoge. ae sure lho1 011 sockets ore
empty wtien w.illchlng power on or
OIi or lnstolling or removing lhe FQk.
lo lnsrau o Pok into the 29a refer to !tie f,oure
and follow th� inslollolion procedure.
Slide 1h8 R::Jk into Ille open
,
ng In mo
programmer.
2. Tlil the Fttk up. and gen1Iy push It bock lo
hook Its flonge o.,er 1h8 lop bock edge of
lhe pcog10"T1mer opening.
J. lower the Pok Into posilion as shown In !he
floure.
CAUTION
811 carefu
l
when lnsertlng the Pl::lli, lr
the connector al me boJtom Of tt,e
Pok (see flgu,eJ nos bent contact
p
i
!\{
S
), lorclng lhe Pok ooulCI bte<ik
tf1e pfn(s) or damage lhe connector .
4 Press do..m gently on the from odge of the
R::Jk to ensure a 000d oonnection
15