background image

Data Domain DD690g Gateway System

FIGurE 1:  

rAck MOuNTING PrOcEDurE

1. 

Align locating pin (A) with rear rack post.

2. 

Extend rails to front of rack.

3. 

Secure front and rear rails to rack  
posts with screws and washers (B).

4. 

Tighten clamp screws (C).

5. 

Repeat for other side of unit.

FIGurE 3: 

FrONT PANEl AND DISk lOcATIONS

Blue circles illustrate the locations of the four hot-swap disks.   
All the other disk slots are filled with drive filler blanks to  
ensure proper air flow through the chassis.

Hot-swap disks:  Physical location: 

Logical numbering:

Drive filler blanks: 

Front Operator Panel LEDs

LED

Status

Power Active

Steady Green: Good

Unit Fault

Steady Amber: Fault

Enclosure ID

Blue: Only when activated

3

9

4

10

7

11

8

12

1

1.1

2

1.2

5

1.3

6

1.4

Front Operator Panel Buttons

Push Button Definition

Power

Press to start boot (if system is not running). 

Never shut down the system by pressing the power button.

System Reset

Resets hardware and firmware. Use ballpoint pen to activate.

Enclosure ID

Press to light a blue LED front and rear to ID chassis in a stack.  

Mutes audible alarm, if active.

FIGurE 2:  

rEAr PANEl AND INPuT/OuTPuT cONNEcTIvITY

Slot 6 

PCI-e (x8)

Slot 5 

PCI-e (x8)

Slot 4 

PCI-e (x4)

Slot 3

 

PCI-e (x4)

Slot 2

 

PCI-X

Slot 1

 

PCI-X

GbE #2 or 

10 GbE #2 

or VTL #1

GbE #1 or 

10 GbE #1 

or VTL #2

FC 

Gateway 

HBA #1

FC 

Gateway 

HBA #2

1024 MB 

NVRAM

Empty

Summary of Contents for DD690g

Page 1: ...Turn the system on Note Third party SAN storage attached to the DD690g must be zoned before you power on the Data Domain system Attach the bezel 10 Collect the information needed for installation Enter the information in section 2 Define the Data Domain System Information for Your Site found to the far right Install Hardware 1 The steps for a complete installation and configuration are 1 Install H...

Page 2: ...Operator Panel LEDs LED Status Power Active Steady Green Good Unit Fault Steady Amber Fault Enclosure ID Blue Only when activated 3 9 4 10 7 11 8 12 1 1 1 2 1 2 5 1 3 6 1 4 Front Operator Panel Buttons Push Button Definition Power Press to start boot if system is not running Never shut down the system by pressing the power button System Reset Resets hardware and firmware Use ballpoint pen to activ...

Page 3: ...way system by the third party external storage connect external storage The Data Domain gateway system can be direct attached to the External Storage Array as in Figure 4 or Fibre Channel FC SAN attached as in Figure 5 A DD690g gateway system has two dual port FC Host Bus Adapters HBAs The first HBA card port is located in PCI e slot 2 and the second in PCI e slot 1 on the rear panel See Figure 2 ...

Page 4: ...el Delete all new values and go to the next section 4 Retry Restart the input entry at the beginning of the current section The value entered previously appears as the default value at each prompt CONFIGURE THE LUNS 4 Use the disk show hardware command to find out the size of each LUN 4 Use the disk show raid info command to check which LUNs are available 4 Use disk add dev to put a LUN into use b...

Page 5: ...pecific Data Domain Integration Documentation at https my datadomain com US en integration jsp CIFS The CIFS configuration section in the Perform Initial System Configuration section sets up the CIFS clients to allow access to backup on the Data Domain system You need to set up the CIFS clients as well to allow access to backup on the Data Domain system For additional configuration informa tion se...

Page 6: ...ensure adequate airflow for cooling Front Bezel Clearance 1 56 inches 4 0 cm of unobstructed clearance Back Panel Clearance 5 inches 12 7 cm of unobstructed clearance Power Grounding Two AC power outlets with an earth ground conductor safety ground A safe electrical earth connection must be provided to each power cord Voltage 100 120 V or 200 240 V Frequency 50 to 60 Hz Site Requirements For infor...

Reviews: