background image

I N S T A L L A T I O N   M A N U A L  

B 0 9 U L F   L I T H I U M   B A T T E R Y  

R e v . 1  

© 2 0 1 9   D a r f o n   E l e c t r o n i c s   C o r p .  

P a g e   2 1   o f   2 8  

6.3

 

Grounding 

Connect the grounding point of the battery module to the casing panel. Fix one end of the yellow-green grounding wire (labeled 
BAT/GND) to the grounding point of the chassis panel with the screw and connect the other end to the grounding point of the 
fixed chassis. Tighten with a screwdriver. 

 

For system safety, the housing of the battery system can be grounded or equipotential connected. Location of the system 
grounding cable is as follows: 

 

 

Summary of Contents for B09ULF

Page 1: ...INSTALLATION MANUAL B09ULF LITHIUM BATTERY...

Page 2: ...attery Modules 7 5 Product Installation 9 5 1 Device list 9 5 2 Before installation 11 5 3 System installation 12 6 Electrical Connection 17 6 1 System Wiring 17 6 2 DIP switch settings 20 6 3 Groundi...

Page 3: ...ation of the system The system allows flexibility in configuration which can be widely applied to household energy storage scenarios Architecture of the battery system is shown on the diagram here One...

Page 4: ...Maintenance and overhaul must be performed by professional maintenance personnel Users should not disassemble the machine to avoid electric shock and product damage During the carry process avoid str...

Page 5: ...ponsible for any injury or loss caused by illegal operation Symbol Definition Symbol Definition Note Due to the danger of not operating as required it may result in moderate or minor injury to the per...

Page 6: ...months The SOC before storage is kept in the range of 40 to 60 20 45 C 3 months 20 50 C 1 month 12 environment humidity No condensation 13 Altitude 14 System noise 40dB 16 Protection level IP55 17 Pol...

Page 7: ...rface 11 button Battery box start stop button 12 Status Display Power and operation fault display 13 14 Input and output positive Battery box power output positive interface 15 Grounding hole Used to...

Page 8: ...sistor is inserted in the first and last CAN communication interfaces for parallel CAN communication matching resistors The terminators are attached as an accessory at the time of shipment DIP switch...

Page 9: ...e installation please check whether the equipment is in good condition and check whether the parts of the accessory package are consistent with the list No Picture Name Specification Model Q ty Remark...

Page 10: ...ower line UL10269 3AWG 600V Orange 2650mm Label 5619100023611 1 pcs Used to connect the battery module negative terminal to the inverter battery side negative electrode 15 Cable with connector 24AWG C...

Page 11: ...product is prohibited from tilting or side discharging and the ventilation on both sides is good leaving a heat dissipation bearing requirements of the battery system Installation location should avo...

Page 12: ...nstallation bracket is used as the standard The left and right sides of the cabinet should be left and installed 300mm cooling space 5 3 2 Installation steps Move the battery cabinet to the installati...

Page 13: ...binet can see the handle as shown in push the handle up the front door pops open rotate the front door 90 degrees to the left push the front door up as shown in The front door latch is disengaged as s...

Page 14: ...g of 406 4mm 16 inches or 304 8mm depending on the width of the mounting wall 12 inch spacing hole draw a mark at the mounting hole with a pen drill the hole expansion screw seat into the hole and kno...

Page 15: ...as shown in below and press the battery box baffle firmly using the screws removed in step 5 The side mounted battery module is shown as Step 9 On the front of the cabinet as shown in fix the four ba...

Page 16: ...rst the second battery box note the placement of B and B as shown above Step 11 Before closing the cabinet please refer to Section 6 for DIP switch settings System wiring Matching resistor installatio...

Page 17: ...d to ensure that the battery module is in the off state all external connection cables are routed from the top of the cabinet through the hole 6 1 1 Connector description The battery B and B terminals...

Page 18: ...6 Use the cable labeled 5619100023601 to pull the B terminal from BAT3 through the waterproof connector to the negative battery terminal of the inverter or charger Step 7 Use the 150mm COM cable label...

Page 19: ...al of the DC Bus Step 2 Use the cable labeled 5619100023601 to connect the B terminals of BAT3 of Cabinet 1 to a negatitive terminal of a DC Bus Use another cable labeled 5619100023601 to connect the...

Page 20: ...itch settings Address 0 1 2 3 4 5 6 7 DIP switch positions Slave MASTER SLAVE 1 SLAVE2 SLAVE3 SLAVE4 SLAVE5 SLAVE6 SLAVE7 SLAVE8 Cabinet 1 Cabinet 2 MASTER Address 0 ADDR 0000 SLAVE4 Address 3 ADDR 01...

Page 21: ...battery module to the casing panel Fix one end of the yellow green grounding wire labeled BAT GND to the grounding point of the chassis panel with the screw and connect the other end to the grounding...

Page 22: ...ghts to indicate protection operation power and function Legend light stays on light flashing at 1 Hz Mode Status Capacity LED Low to high ALM RUN Shutdown Charging SOC 0 25 SOC 26 50 SOC 51 75 SOC 76...

Page 23: ...re connected in parallel insert the RS485 communication interface into the RS485 interface on the front panel of the MASTER address 0000 battery box communicate with the computer through the 485 commu...

Page 24: ...Y R e v 1 2 0 1 9 D a r f o n E l e c t r o n i c s C o r p P a g e 2 4 o f 2 8 Parallel summary of module information Enter the battery pack information 4 click the current state you can see the par...

Page 25: ...I N S T A L L A T I O N M A N U A L B 0 9 U L F L I T H I U M B A T T E R Y R e v 1 2 0 1 9 D a r f o n E l e c t r o n i c s C o r p P a g e 2 5 o f 2 8 Parallel summary information...

Page 26: ...situation Short battery discharge time Low battery Keep the product charged for more than 4 hours to fully charge the battery Product overload Check load status and remove non critical products Batte...

Page 27: ...ws and regulations The system is heavy and must be transported by mechanical means The equipment and packaging cannot be drenched so it cannot be transported in the open air 9 3 System storage Storage...

Page 28: ...an Taoyuan 333 Taiwan R O C Tel 886 3 2508800 USA Office Darfon America Corp 103A Pioneer Way Mountain View CA 94041 Tel 1 650 316 6300 For more information www darfonsolar com 2018 Darfon Electronics...

Reviews: