Oilburner
Type Gulliver RG3D
Page 4 of 10
Assembling
Dimensioning of the oil pipes
K:\framen\instrukt\Dantherm\RG\Engelsk\RG3D\RG3.fm-M2-021114-dm/lbk
Max lenght of suction line
H
Dimensioning
8/10 mm
10/12 mm
0 m
35 m
100 m
0,5 m
30 m
100 m
1,0 m
25 m
100 m
1,5 m
20 m
90 m
2,0 m
15 m
70 m
3,0 m
8 m
30 m
3,5 m
6 m
20 m
The burner is designed to allow entry of the oil supply pipes on either side. Depending on
the oil supply pipes position (to the right or to the left hand side of the burner).
One-line system:
On the tank installa-
tion, where vacuum
can occur in the oil
tubes, you install a
flow-control between
the front filter and the
oil burner.
The pump suction should
not exceed a maximum of
0.4 bar (30 cm Hg). Bey-
ond this limit gas is rea-
lised from the oil.
Oil lines must be complet-
ely air tight.
It is necessary to install a filter on
the fuel supply line.
Start the burner and wait for the priming.
Should lock-out ocur prior to the arrival of the fuel,
await at least 20 seconds before repeating the
operation.