13
Installation
: General location requirements
en
and here shown in operation
mode B
80
620
1122
320
80
1122
320
620
1
2
Fig. 10
No
Description
1
This space is mandatory in order to lift the unit upwards in its wall bracket. Please AL-
WAYS mount the bracket and reserve this space, at the unit end, in which the T1 and
T4 (cold ducts) are connected. If preheater is installed, this additional space is require
to make future service if needed.
2
In order to be able to mount the screws into the ceiling properly, please add mini-
mum this space shown
If installing the unit onto the wall, always have the T1 and T4 (cold ducts) in the bottom of the
unit. If the unit has additional preheater, please allow space for this as well, see illustration.
70
1122
110
620
550
Pre-heater space
Fig. 11
Service space, wall
Summary of Contents for HCC 2 ALU
Page 1: ...HCC 2 ALU PLA E1 SERVICE MANUAL en de fr es da nl Rev 1 0 2019 W39 2 ...
Page 2: ......
Page 38: ...38 Appendix Week program specification ...
Page 228: ...228 Appendix Schema s ...
Page 229: ......
Page 230: ......
Page 231: ......