12
Installation
: General location requirements
Installation
General location requirements
The HCC 2 must fulfil all of the previous consideration prior to starting any installation pro-
cess.
The following should be considered selecting an appropriate location for installation:
1. The HCC 2 units, is designed to be mounted in dry surroundings, with temperatures
>12°C. Utility room or similar heated rooms.
2. The HCC 2 can be mounted vertically or horizontally. Please ensure that the ceiling or
walls structure is adequate to withstand the additional weight of the unit.
3. The air flow direction can be electronically swapped, providing ability to route the con-
nected ducts, either to the right or to the left. See more about swapping at page 16.
4. It is
mandatory
to tilt the HCC 2 minimum 1° towards the drain. The enclosed bracket will
automatically provide this requirement.
The HCC 2 is designed for hidden installation.
It is very important to leave additional space:
• Adequate space for exchanging the unit if needed, including turning the unit into its
bracket and up, if mounting underneath the ceiling.
• External preheater (accessory), which is mounted external into the duct system on the T1
incoming outside air, minimum 320 mm from the unit.
• Additional space, in order to inspect and test any drainage hose, also if no preheater is
installed..
This applies also for after sales situations, where the unit is to be dismounted completely for
service. Any warranty claim will not be acknowledge if these above requirements are not
fulfilled.
See min. measurements on page 13.
If installing the unit underneath the ceiling, please reserve space for the tilting up/down, and
additional space, if electrical preheater is installed.
Additional space dimensions here shown in operation
mode A
80
620
1122
320
80
1122
320
620
1
2
Fig. 9
Introduction
Location and duct
connections
Reserve additional
space
Service space,
ceiling
Summary of Contents for HCC 2 ALU
Page 1: ...HCC 2 ALU PLA E1 SERVICE MANUAL en de fr es da nl Rev 1 0 2019 W39 2 ...
Page 2: ......
Page 38: ...38 Appendix Week program specification ...
Page 228: ...228 Appendix Schema s ...
Page 229: ......
Page 230: ......
Page 231: ......