DANLERS CEFLAPIR Installation Notes Download Page 2

Installation procedure

1. Please read these notes carefully before commencing work. 

In case of doubt please consult a qualified electrician.

2. POSITIONING: The CEFLAPIR should be installed to achieve correct 

coverage of the area, see diagram A. If the photocell override facility 

is required, the switch must be located above an area where daylight 

can give greater illumination than the artificial light. Avoid locating this 

product where it is exposed to windy or drafty conditions (exposed 

lobbies, open ceiling voids or near ventilation fans) or near heat 

sources. To cover large areas CEFLAPIRs should be spaced in a 

5 metre grid formation.

3. The greatest energy savings will be made if each CEFLAPIR controls 

an independent set of lamps. They can be wired in parallel but this 

should ideally be limited to three, see diagram E.

4. Make sure the power is isolated from the circuit.  

The CEFLAPIR should be connected as shown in diagrams D & E:

 

L - Live in.      N - Neutral in.   AB - Absence in.       SL - Switched Line out.

  Terminate the mains cable with the supplied terminal block (terminal 

blocks must comply with EN 60998-1 or EN 60998-2-1 and be suitable 

for 0.75- 1.5mm2 conductors). In order to comply with wiring regulations, 

the terminal block must be enclosed in a suitable wiring box (This should 

comply with EN 60670-1 or EN 60670-22).

 

Start-up mode

When the CEFLAPIR is powered up, it will switch on the load for 1 

minute, the load will then switch off and the CEFLAPIR will enter its 

Operating Mode. 

 

Time and Lux set-up

For convenience, ensure that the TIME is set to the minimum when 

setting up the LUX level. Afterwards set the TIME to a value suitable 

for the application, making reference to diagram C.
The LUX is best set up when the local ambient light is at approximately  

the minimum desired working light level. With the LUX set fully clockwise 

wait for the CEFLAPIR to switch off. Step the LUX adjuster slowly 

anticlockwise (- to +), at each position operate the momentary wall 

switch and continuing until the lamps switch on. 

Clearance hole 

63 or 64mm (2.5") diameter

Springs can either be left closed (down

the side of the product) or opened out.

TIME

min

max

LUX

max

min

Typical settings

30 LUX

1000 LUX

PHOTOCELL

INACTIVE

40m

20m

10m

5m

2.5m

80s

10s
20s

40s

up to 5m

up to 7m

Strong detection zone 

i.e. person moving arm

or walking towards PIR

Secondary detection zone

i.e. person walking

perpendicular to PIR 

For optimum coverage

recommended mounting
height: 2.4 to 5m

A: Mounting diagram

 

B: Detection diagram

D: Wiring diagram, single CEFLAPIR E: Wiring diagram, multiple CEFLAPIRs

C: Adjusting time and lux

L

N

load

CEFLAPIR

230 VAC

L

AB

SL

Mains rated 

retractive wall 

switch

L

N

L

N

load

A few  

CEFLAPIR

230 VAC

Mains rated 

retractive wall 

switch

L

AB

SL

Reviews: