7.
-
a.
-
b.
-
c.
-
-
8.
e
3
0
b
g
0
8
6
.1
0
Illustration 2: IP55
Install the fieldbus and other cables. See more information in section Cabling. When installing option boards with D9 con-
nector, use a separate grounding cable for grounding.
To make a 360° grounding, strip the cables connected to the D9 connector and install the grounding cable con-
nector around the stripped part of the cables.
Attach the cable shoe to the short grounding bracket at the other end of the grounding cable with a screw.
When the D9 connector is mounted to option board, install the grounding cable to the grounding cable connector
mounted around the stripped cable in step a.
With D9 connectors on both slots D and E:
For slot D, mount first the option board and route the grounding cable below all cables. Make sure that the
cable connector is facing down.
For slot E, route the option board grounding cable on top of the cables.
b
c
e3
0b
i2
71
.1
0
Close the cover of the AC drive.
AN338644703080en-0002 / DPD02156
14 | Danfoss A/S © 2022.08
Installing
VACON® RS485 and CAN Bus Option Boards
Installation Guide
Summary of Contents for VACON OPTC2
Page 2: ......