9.2 Commissioning the Inverter
Context:
Follow these instructions to commission the inverter.
Prerequisites:
Read the safety instructions in
and
9.1 Safety Checks before Starting the Commissioning
, and obey them.
Procedure
1. Make sure that the motor is installed correctly.
2. Make sure that the motor is not connected to mains.
3. Make sure that the inverter and the motor are grounded.
4. Make sure to select the DC supply cable, the brake cable, and the motor cable correctly.
For information on cable selections, see:
•
6.1.3 Cable Selection and Dimensioning
•
•
6.3 EMC-compliant Installation
5. Make sure that the control cables are as far as possible from the power cables. See
6.5.1 Additional Instructions for Cable
6. Make sure that the shields of the shielded cables are connected to a grounding terminal that is identified with the grounding
symbol.
7. Do a check of the tightening torques of all the terminals.
8. Make sure that no power correction capacitors are connected to the motor cable.
9. Make sure that the cables do not touch the electrical components of the inverter.
10. Make sure that the common input +24 V is connected to an external power source and the ground of the digital input is connected
to ground of the control terminal.
11. Do a check of the quality and quantity of the cooling air.
For further information on cooling requirements, see:
•
5.2.1 General Cooling Requirements
•
•
12. Make sure that there is no condensation on the surfaces of the inverter.
13. Make sure that there are no unwanted objects in the installation space.
14. Before connecting the inverter to DC supply, do a check of the installation and the condition of all the fuses (see
) and other protective devices.
9.3 Measuring the Cable and Motor Insulation
Do these checks if necessary.
•
The insulation checks of the motor cable, see
9.3.1 Insulation Checks of the Motor Cable
•
The insulation checks of the DC supply cable, see
9.3.2 Insulation Checks of the DC Supply Cable
•
The insulation checks of the motor, see
9.3.3 Insulation Checks of the Motor
Commissioning
Operating Guide | VACON® NXI Inverters FI9-FI14
AQ304441431479en-000101 / DPD00909
86 | Danfoss A/S © 2019.11
Summary of Contents for VACON NXP FI10
Page 1: ...Operating Guide VACON NXI Inverters FI9 FI14...
Page 2: ......