Figure 4-50 Backplane IGV LEDs
10. Verify the IGV position indicator moves toward closed.
11. Measure the +15V test point on the Backplane to verify voltage is supplied to the Serial Driver for the
IGV. Refer to Figure 4-51 Bac15V Test Point.
Figure 4-51 Bac15V Test Point
4.9.3 IGV Housing Removal and Installation
• • • CAUTION • • •
Removal of the IGV mounting fasteners will release refrigerant. Isolation and recovery of the refrigerant must be performed by a qualified
service technician adhering to industry/ASHRAE standards.
4.9.3.1 IGV Housing Assembly Removal
1. Isolate compressor power.
2. Remove the clamp securing the IGV Connector. Refer to Figure 4-52 IGV Harness Removal on page 86.
for this and the following step.
3. Disconnect the IGV Motor Cable and Suction Sensor connector.
M-SV-001-EN Rev. H-1/23/2023 Page 85 of 294
Summary of Contents for Turbocor TT Series
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 294 M SV 001 EN Rev H 1 23 2023...
Page 14: ...Page 14 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 16: ...Page 16 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 18: ...Figure 1 2 New Type Code Page 18 of 294 M SV 001 EN Rev H 1 23 2023...
Page 46: ...Page 46 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 250: ...Page 250 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 268: ...Figure 5 3 Bearing Calibration Flow Page 268 of 294 M SV 001 EN Rev H 1 23 2023...
Page 274: ...Page 274 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 286: ...Page 286 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 290: ...Page 290 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 292: ...Page 292 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...