Figure 1-15 DC Bus Test Harness Connection Diagram (Closed-Top Soft Start)
3. Connect the two (2) plugs of the DC bus test harness into the Soft Start. Refer to Figure 1-13 Soft Start
4. Route the cables through the cable passage on either side of the DC-DC Converter, down into the
service side. Refer to Figure 1-16 Cable Passage.
NOTE
l
For clarity purposes, several components have been removed from Figure 1-16 Cable Passage
Figure 1-16 Cable Passage
5. Carefully adjust the connectors and harness so that the Top Cover can be reinstalled.
6. Install the top covers. Refer to Section 4.1 Compressor Covers on page 52.
7. Remove ESD strap from the compressor and yourself.
8. Reapply AC power to the Compressor.
Page 28 of 294 - M-SV-001-EN Rev. H 1/23/2023
Summary of Contents for Turbocor TT Series
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 294 M SV 001 EN Rev H 1 23 2023...
Page 14: ...Page 14 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 16: ...Page 16 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 18: ...Figure 1 2 New Type Code Page 18 of 294 M SV 001 EN Rev H 1 23 2023...
Page 46: ...Page 46 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 250: ...Page 250 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 268: ...Figure 5 3 Bearing Calibration Flow Page 268 of 294 M SV 001 EN Rev H 1 23 2023...
Page 274: ...Page 274 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 286: ...Page 286 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 290: ...Page 290 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 292: ...Page 292 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...