Figure 4-236 DC-DC Harness Routing
4.24.5.2 DC-DC Harness Installation
1. Carefully pull the harness down through the cable passage.
2. Connect J4, J20, J22, and J24 to the Backplane. Refer to Figure 4-238 Backplane Connections on page
3. Connect the Soft Start Temperature Harness Connector to the J9 or J7 on the Soft Start.
4. Connect the 24VDC and 250VDC output from the DC-DC. Refer to Figure 4-229 Potted DC-DC on page
206 andFigure 4-230 Open Frame DC-DC on page 206 for further details.
5. Connect the two (2) motor thermistor connections to the Motor Top Plate.
6. Install any cable ties as necessary.
7. Install the Service Side Cover. Refer to Section 4.1.3.1 Service Side Cover Removal and Installation on
8. Install the top covers. Refer to Section 4.1.2 Top Cover on page 53.
9. Return the compressor to normal operation.
Page 210 of 294 - M-SV-001-EN Rev. H 1/23/2023
Summary of Contents for Turbocor TT Series
Page 2: ...THIS PAGE INTENTIONALLY LEFT BLANK Page 2 of 294 M SV 001 EN Rev H 1 23 2023...
Page 14: ...Page 14 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 16: ...Page 16 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 18: ...Figure 1 2 New Type Code Page 18 of 294 M SV 001 EN Rev H 1 23 2023...
Page 46: ...Page 46 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 250: ...Page 250 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 268: ...Figure 5 3 Bearing Calibration Flow Page 268 of 294 M SV 001 EN Rev H 1 23 2023...
Page 274: ...Page 274 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 286: ...Page 286 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 290: ...Page 290 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...
Page 292: ...Page 292 of 294 M SV 001 EN Rev H 1 23 2023 THIS PAGE INTENTIONALLY LEFT BLANK...