Danfoss Heating
23
GB
PL
GR
ES
GB
0:45
45 mins, warm air system poorly insulated building.
1:00
60 mins, radiator system, light weight well insulated building.
(Factory setting)
1:15
75 mins, radiator system, light weight medium insulation.
1:30
90 mins, radiator system, medium weight poorly insulation.
1:45
105 mins, radiator system, heavy weight building, well
insulated.
2:00
120 mins, radiator system, heavy weight building, poorly
insulated.
Option 13 - Optimum start control/Delayed start event setting
(Option 11 set to 1 or 2)
The Optimum start or delayed start control can
be applied to event 1 only or to each event of the
day which requires a higher temperature than
the previous event. Press
+
until Option 13 is
displayed, use
Λ
and
V
to select required setting
(only active if Option 11 is set to 1 or 2).
Setting 0
Applies only to fi rst event of day. (Factory setting)
Setting 1
Applies to each event of the day that requires a higher
temperature compared to previous event.
4.2 Overview of installer selectable features
which may aff ect the operation of your
thermostat
Temperature range limitation
This allows the installer to programme both upper and lower
temperature limits. It may limit the upper and lower temperature
that you are able to set on the thermostat.
Temperature override limitation
This allows the installer to limit the number of degrees that you can
override the programmed temperature by, it also allows the installer
to set rules regarding how long a temperature override will remain
in place.
Summary of Contents for TP9000
Page 54: ...TP9000 54 GB PL ES GR TP9000 LCD TP9000 CH HW LED on o TP9000 on o 3 4 on o 2 3 4 5 1 2...
Page 56: ...TP9000 56 GB PL ES GR 1 3 TP9000 71 PROG 3 V V V...
Page 57: ...Danfoss Heating 57 GB PL ES GR PROG 10 PROG RUN 55 1 4 7 58 5 2 59 24 60 A B 1 72...
Page 58: ...TP9000 58 GB PL ES GR NEXT RUN PROG RUN RUN 2 6 4 2 1 2 3 CH HW 7 PROG 10 V CH NEXT 2...
Page 64: ...TP9000 64 GB PL ES GR V V DAY HOL CH HW CH HW DAY...
Page 66: ...TP9000 66 GB PL ES GR 2 4 C F V C F 2 5 5 30 C V 5 C 10 73 V V MODE 69 2 6 3 82...
Page 67: ...Danfoss Heating 67 GB PL ES GR 2 7 10 73 V MODE 2 8 V 11 73...
Page 68: ...TP9000 68 GB PL ES GR 2 9 OSC 12 13 74 75 3 0 TP9000 1 2 3 auto allday on o CH HW INFO RESET...
Page 70: ...TP9000 70 GB PL ES GR AUTO 4 2 ON OFF AUTO 6 3 ON OFF 66 2 5 INFO INFO HRS BOOST INFO 24 i...
Page 74: ...TP9000 74 GB PL ES GR 1 OSC 120 0 12 2 OSC 12 11 1 12 V 11 1...
Page 77: ...Danfoss Heating 77 GB PL ES GR 28 1 4 4 RESET RESET PROG Service Interval Date...
Page 79: ...Danfoss Heating 79 GB PL ES GR 93 94 1 A B 2 3 4 10 11 12 13...