Page
28
of
108
M-AP-001-EN Rev. N
M-AP-001-EN Rev. N
Control Interface Wiring
The Compressor I/O Board is the entry point for control wiring from the chiller/plant to the
compressor. Refer to Figures 4-1 and 4-2 for the proper Compressor I/O Board connectivity.
Figure 4-1 - Typical Control
Wiring
OUT
I/O
I/O
IN
IN
IN
IN
OUT
OUT
OUT
OUT
IN
IN
OUT
OUT
OUT
OUT
IN
IN
IN
IN
ModBus Common (Shield)
ModBus RS-485 NetB
ModBus RS-485 NetA
0-10V
Demand -
Interlock Contact - Safety N/C
Interlock Contact - Safety N/C
Compressor Status - N/O Contact
Compressor Status - N/O Contact
Entering Chilled Water
Temp. Sensor
Leaving Chilled Water
Temp. Sensor
EXV Phase 1A
EXV Phase 1B
EXV Phase 2A
EXV Phase 2B
EXV #1
(Evaporator or
load balancing
valve)
EXV Phase 1A
EXV Phase 1B
EXV Phase 2A
EXV Phase 2B
EXV #2
(Economizer or
load balancing
valve)
Level 15V
Sensor Signal , 1-5Volts
Level Sensor 0V
Level 15V
Sensor Signal , 1-5Volts
Level Sensor 0V
Level
Sensor
#1 (Evaporator)
Level
Sensor
#2 (Economizer)
Liquid Tempe
Liquid Temperature -
Compressor Running - N/O Contact
Compressor Running - N/O Contact
Pressure Sensor Signal, 1-5Volts
5V
Sensor 0V
Temperature Sensor Signal, 1-5Volts
*Universal Analog
*Universal Analog Output -
* Universal output can be used for :
output manual control
0-5VDC or 0-10VDC
RS232 Monitoring Connector (DB9)
J6
J7
J1
J2
J4
J5
J3
J8
LIQDT
SPEED
ST
ATUS
I/LOCK
DEMAND
COM
NET
A
NETB
EXV1
EXV2
1A
1B
2A
2B
1A
1B
2A
2B
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
IN
IN
IN
OUT
IN
OUT
RUN
ENTR
Y
LEA
VE
ANALOG
Float
Float
SP
ARE T
SP
ARE P
No function
No function
**Level sensor circuit can be configured
for two types of sensors using jumpers
JP5 and JP6. Refer to the Installation and
Operations Manual for details.
4 Control Interface Wiring
RS485-1
I-L
ock
CIM Board
RS485-1
I-L
ock
CIM Board
RS485-1
I-L
ock
CIM Board
REF
+
-
Shield
REF
+
-
Shield
REF
+
-
Shield
REF
-
+
120
Ω
PLC
COM NE
TB NE
TA
MODBUS
Retain
Termination
Jumper in
Last Board
Remove Termination
Jumper in All
Intermediate Boards
Termination Resistor should only be included
if one is not included in the PLC. If the PLC
has a resistor installed, do not add an addi-
tional one. If the PLC does not have a resistor
installed, then one should be installed.
Figure 4-2 - ModBus
Grounding Diagram
Summary of Contents for TG230 Series
Page 2: ...Page 2 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 8: ...Page 8 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 18: ...Page 18 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 32: ...Page 32 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 36: ...Page 36 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 44: ...Page 44 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 50: ...Page 50 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 52: ...Page 52 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 54: ...Page 54 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 56: ...Page 56 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 58: ...Page 58 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 70: ...Page 70 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 74: ...Page 74 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 82: ...Page 82 of 108 M AP 001 EN Rev N Physical Data Figure 16 9 Suction Port All Models ...
Page 88: ...Page 88 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 90: ...Page 90 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 92: ...Page 92 of 108 M AP 001 EN Rev N THIS PAGE INTENTIONALLY LEFT BLANK ...