4.0 Mounting

4.1 Mounting

Installation must be in compliance with local standards and
regulations.
District heating (DH) - In the following sections, DH refers to the
heat source which supplies the substations. A variety of energy
sources, such as oil, gas or solar power, could be used as the
primary supply to Danfoss substations. For the sake of simplicity,
DH can be taken to mean the primary supply.

Connections:

1. Domestic cold water (DCW)

2. Domestic hot water (DHW)

3. District heating (DH) supply

4. District heating (DH) return

Connection sizes:

DH:

G ¾” (int. thread)

DCW + DHW:

G ¾” (int. thread)

Dimensions (mm):

Type 1 + 2 without cover:
H 428 x W 312 x D 155
Type 1 + 2 with cover:
H 430 x W 315 x D 165
Type 3 without cover:
H 468 x W 312 x D 155
Type 3 with cover:
H 470 x W 315 x D 165

Weight (approx.):

10 – 12 kg

Authorized personnel only

Assembly, start-up and maintenance work must be performed by
qualified and authorized personnel only.

The pipe placement can deviate from the shown drawing. Please note
the markings on the station.

4

DEN-GT

LGB38000

Summary of Contents for Termix One-B-1 BS Series

Page 1: ...1 Safety Notes general 3 4 0 Mounting 4 4 1 Mounting 4 5 0 Design 6 5 1 Design 6 5 2 Schematic diagram 7 6 0 Controls 9 6 1 DHW temperature control 9 6 2 Maintenance 10 7 0 Troubleshooting 11 7 1 Tro...

Page 2: ...water very efficiently thereby creating a very good operation economy Domestic hot water DHW The domestic hot water is prepared in the heat exchanger and the temperature is regulated with a thermostat...

Page 3: ...leaks or other dangerous circumstances interrupt all energy sources to the station if possible and seek expert help In case of discoloured or bad smelling domestic hot water close all shut off valves...

Page 4: ...supply Connections 1 Domestic cold water DCW 2 Domestic hot water DHW 3 District heating DH supply 4 District heating DH return Connection sizes DH G int thread DCW DHW G int thread Dimensions mm Typ...

Page 5: ...tallation Clean and rinse Prior to installation all substation pipes and connections should be cleaned and rinsed Tightening Due to vibration during transport all substation connections must be checke...

Page 6: ...mix One B 1 Series BS 5 0 Design 5 1 Design Your substation might look different than the substation shown Design description B Heat exchanger DHW O Termix sensor accelerator 7 Thermostatic controller...

Page 7: ...ermix One B with GTU Second diagram Termix One B with safety valve Schematic description B Heat exchanger DHW 7 Thermostatic valve 2 Single check valve 21 To be ordered separately 4 Safety valve 62 GT...

Page 8: ...BS 5 2 1 Technical parameters Technical parameters Nominal pressure PN 16 Max DH supply temperature 120 C Min DCW static pressure 0 5 bar Brazing material HEX Copper Heat exchangers test pressure 30...

Page 9: ...supply temperatures of up to 90 C Thermostatic control DHW temperature is adjusted as follows To increase temperature turn the handle on the thermostatic controller to select a higher number To decrea...

Page 10: ...e energy meter at regular intervals and to write down the meter readings Regular inspections of the substation according to this Instruction are recommended which should include Strainers Cleaning of...

Page 11: ...k circulation pump Defective or clogged non return valve Replace clean No electricity Check Wrong setting of automatic controls if any To adjust an electronic controller for DHW pls note enclosed inst...

Page 12: ...x One B 1 Series BS 7 3 Disposal Disposal This product should be dismantled and its components sorted if possible in various groups before recycling or disposal Always follow the local disposal regula...

Page 13: ...Installation Guide Termix One B 1 Series BS LGB38000 DEN GT 13...

Page 14: ...Installation Guide Termix One B 1 Series BS 14 DEN GT LGB38000...

Page 15: ...cts Substations Category 0 without electrical equipment covered by this declaration are in conformity with the following directives standards and other normative documents provided that they are used...

Page 16: ...Installation Guide Termix One B 1 Series BS Produced by Gemina Termix A S 02 2015...

Reviews: