background image

© Danfoss, 2015-08 

L1216888

 • Rev BD • Aug 2015 

3

Mekanisk justering af max flow

Mechanical adjustment of max flow

Mechanische Einstellung des maximalen Volumenstroms

Ajustement mécanique du débit maximum

Trykindstilling PVP

Pressure setting PVP

Druckeinstellung PVP

Réglage de pression PVP

Before week 40/2003

Week 40/2003 - week 2/2012

After week 2/2012

Relief valve 1

x

x

Relief valve 2

x

x

Relief valve 2

Relief valve 1

V310367.A

6 ±1 N•m

[53 ±9 lbf•in]

10 [0.40]

3 [0.12]

6 [0.24]

V310402.B

4 [0.16]

360

o

≈120 bar 

           [1740 psi]

360

o

≈100 bar 

           [1450 psi]

Montage af PVE

Installation of PVE

Montage von PVE

Installation de PVE

V310 397.B

V310 397.B

V310402.B

V310367.A

Summary of Contents for PVG 16

Page 1: ...éro semaine et année de fabrication et numéro sériel G Semaine et année de fabrication Identifikation Identification Standardmontage PVP til venstre for PVM Standard installation PVP to the left of PVM Normale Montage PVP links von PVM Montage standard PVP à gauche de PVM Montering og orientering af stik Installation and plug orientation Montage und Ausrichtung des Steckers Montage et orientation ...

Page 2: ... rondelle en cuivre 30 N m 270 lbf in 50 N m 445 lbf in 30 N m 270 lbf in 50 N m 445 lbf in 20 N m 180 lbf in 15 N m 135 lbf in 20 N m 180 lbf in Med aluminiumsskive With aluminium washer Aluminium Dichtring Avec rondelle en all 70 N m 620 lbf in 110 N m 970 lbf in 70 N m 620 lbf in 110 N m 970 lbf in 30 N m 270 lbf in 15 N m 135 lbf in 30 N m 270 lbf in Med skærekant With cutting edge Mit Dichtka...

Page 3: ...ressure setting PVP Druckeinstellung PVP Réglage de pression PVP Before week 40 2003 Week 40 2003 week 2 2012 After week 2 2012 Relief valve 1 x x Relief valve 2 x x Relief valve 2 Relief valve 1 V310367 A 6 1 N m 53 9 lbf in 10 0 40 3 0 12 6 0 24 V310402 B 4 0 16 360o 120 bar 1740 psi 360o 100 bar 1450 psi Montage af PVE Installation of PVE Montage von PVE Installation de PVE V310 397 B V310 397 ...

Page 4: ...pen er monteret vertikalt anbefales det at udlufte ved justerskruer Pos A Bemærk Ved PVEA kan det pga dens hydrauliske opbygning være påkrævet at foretage udluftning Bleeding If the group is installed vertically it is recommended to bleed it at the adjusting screws Pos A Note Because of the hydraulic build up of PVEA it may be necessary to bleed the PVEK Entlüftung Wenn die Gruppe vertikal montier...

Reviews: