![Danfoss PCV-VFQ 21 Instructions Manual Download Page 16](http://html.mh-extra.com/html/danfoss/pcv-vfq-21/pcv-vfq-21_instructions-manual_507194016.webp)
4
2
3
1
5
6
16
VI.JA.G2.02
© Danfoss 11/2006
DH-SMT/SI
Instructions
Pilot-controlled PCVQ DN 100 - DN 250 (PN 16, PN 25)
9.2 Replacement of Trim Valve VFQ 21
The trim can be replaced by qualified personnel
up to DN 125. From DN 150 replacement should
be carried out by the Danfoss service personnel.
Removing the trim:
Valves DN 100–125
1. Dismount actuator
1
(see section 9.1).
2. Unscrew hexagon head cap screw
2
.
3. Remove bonnet
3
.
4. Take out trim
4
.
Prior to installation:
Clean sealing surfaces 5 and socket 6, grease
sealing surfaces with antiseize graphite
petroleum.
Installing the trim
:
Mounitng is carried out in reverse order.
Torque hexagon head cap screws
2
:
DN
Torque
Wrench
100 - 125
180 Nm
SW 30
9
Replacement of Valve,
Actuator, Trims