Connection outdoor unit to DHP-A
121
80
85
122
D
96
3
B
C
A
94
100
112
84
85
3
Outdoor unit
112
Expansion vessel
80
Shut-off valve
121
Brine in
84
Manometer
122
Brine out
85
Air bleeding valve
A
Shut-off valve (part of 94)
94
Filling device
B
Shut-off valve (part of 94)
96
Flexible hoses
C
Dirt strainer with shut off valve (part of 94)
100
Safety valve
D
Moved out sensor, brine out
Connection brine DHP-C Opti W/W
73 71
85
71
Flow guard
73
2-way valve
85
Air bleeding valve
5.3.2
Drill holes for brine pipes
Caution
Ensure that the holes for the insert pipes are positioned so that there is room for the other installations.
Caution
The brine pipes shall have separate lead-ins. If the wall lead-ins are below the highest ground water level wa-
tertight lead-ins must be used.
Installation Guide
Domestic heat pumps
VMGFQ102
Danfoss Heating Solutions
28