D
GB
F
E
© Danfoss | Climate Solutions | 2023.06
AQ452044031215en-000201 | 33
10.1 Capacity regulator
Fig. 18
CR 1
CR 2
ATTENTION If the capacity regulator is installed at the factory, it is subsequently
installed and connected by the customer
.
10
|
Accessories
CR 1
Delivery condition 1 (from the factory):
Cylinder cover prepared for capacity regulator.
Fig. 20
Before commissioning, the blind flange with
screws must be removed and replaced by the
new set capacity regulator with O-ring joints
and screws. Observe position and construction
of the capacity regulator.
Attention! Compressor is under pressure!
Depressurize the compressor first.
Delivery condition 2 (from the factory):
Connect capacity regulator in terminal box or
switch cabinet.
Fig. 19
Fig. 21
HG44e
HG56e