Safety Notes

Prior to assembly and commissioning 

to avoid injury of persons and damages 

of the devices, it is absolutely necessary 

to carefully read and observe these instructions.
Necessary assembly, start-up, and maintenance 

work must be performed only by qualified, 
trained and authorized personnel.
Prior to assembly and maintenance work on the 

controller, the system must be:

- depressurized,

-  cooled down,

-  emptied and

- cleaned.

Please comply with the instructions of the 
system manufacturer or system operator.

Disposal instructions

 This product should be dismantled 
and its components sorted, if possible, 
in various groups before recycling or 

disposal.
Always follow the local disposal regulations.

Definition of Application

The controller is used for differential pressure 

control in bypass lines of water and water glycol 

mixtures for heating, district heating and cooling 

systems.
The technical data on the label plates determine 
the use.

Scope of Delivery 

*) adapter 003G1780,  accessory sold separately, 
**) Impulse tube AF, accessory sold separately

Assembly

Admissible Installation Positions 

  media temperatures up to 150 °C: 

Can be installed in any positi on.

  media temperatures > 150 °C. 

Installation permitted only in horizontal 
pipelines with the actuator oriented 
downwards.

Installation Location and Installation 
Scheme 

Bypass installation

The valve is closed without pressure 
and is opening on rising differential 
pressure 

.

Valve Installation 

1.  Install strainer 

 before the controller.

2.  Rinse system prior to installing the valve.
3. Observe flow direction 

 on valve body.

 Flanges 

 in the pipeline must be in 

parallel position and sealing surfaces 
must be clean and without any damage.

4.  Install valve.
5.  Tighten screws crosswise in 3 steps up to the 

max. torque.

Actuator Installation 

 The actuator stem must be screwed into 
the valve stem. Spring on the pressure 
actuator is factory adjusted (stressed). 
For proper installation spring has to be 
released (unstressed) first.

1.  Remove the spindle protection cup and 

release the valve spindle by removing the 

nut, washer and cardboard tube.

2.  Align the actuator stem with the valve stem, 

connect both stems and turn gently the 

whole pressure actuator clockwise with both 

hands, until the stems are fully connected 

(valve stem fully screwed into the actuator 

stem). 

3.  Release the uninon nut by pulling out the 

blocking spring.

4.  Tight the union nut by hand or with wrench 

key using minimal force

5.  Release the pressure actuator by turning it 

counter clockwise for approximately half a 

turn.

6.  Observe the position of impulse tubes 

connection to the valve and align the 

actuator accordingly.

7.  Hold the actuator in the position and tight 

the union nut to the valve with 100- 120 Nm 
torque.

Impulse Tube mounting 

•  Which impulse tubes to use?
 

The impulse tube set AF (2×) 

❻①

 can be 

used: Order No.: 

003G1391

 

or use the following pipes: 

Steel /

Stainless steel

Ø 10×1

ISO 1127 D3/T3

Copper

Ø 10×1

Cu-DHP R200 

EN12449

• 

The impulse tube 

③ 

can be connected

 

directly to the valve

 

 or
 

to the pipeline

 

.

Connection to the valve 

1.  Remove plug 

 at the valve.

2.  Screw in threaded joint G 1/4 

 with copper 

seal, Torque 40 Nm.

- or -

Connection to the Pipeline 

❽①

No connection downwards/upwards 

, could

bring dirt/air into an impulse tube.
1.  Cut pipe in rectangular sections 

 and 

deburr.

2.  For copper pipe: 

insert sockets 

 on both sides.

3.  Verify the correct position of the cutting 

ring 

.

4.  Press impulse tube 

 into the threaded joint 

up to its stop.

5.  Tighten union nut 

 Torque 40 Nm.

 When installing seal pots 

❽⑧

, please 

observe the Installati on Instructions 
for the seal pots.

Insulation 

For media temperatures up to 120 °C the 
pressure actua tor may be insulated 

.

Dismounting 

 

Danger

Danger of injury by hot water

Prior to dismounting depres surize system or 
use shut off valves on the impulse tubes! 

Carry out dismounting in following steps: 

1.   Fasten pressure actuator with the safety 

bands to the fixed points in surroundings 

2.  Before releasing the actuator, fully release 

the union nut

3.   Hold the pressure actuator with both 

hands, and release it by turning it counter 

clockwise ~30 turns. During turning, control 

the actuator weight all the time to prevent 

unexpected fall of detached actuator.

4.   Carefully remove the actuator from the valve.
Before installing actuator back to the valve, 
setting spring must be fully released again.

Leak and Pressure Test 

Observe max.
permitted pressure, see below.

The pressure behind the valve 

 must not 

exceed the pressure before the valve 

.

Observe nominal pressure 

 of the valve. 

Caution:

The valve is closed without pressure and it 

opens on rising pressure before the valve.

Prior to pressure tests

, it is 

absolutely

 necessary 

to remove the impulse tube at the valve 

.

Close connections with plugs G ¼ ISO 228.
Max. pressure [bar] with connected impulse tube:

AFPA 2 

cm

2

32

80

160

320

640

bar

16

5

2.5

1.3

0.35

Max. test pressure with disconnected impulse 

tube must not exceed the plant testing pressure 

and must always be lower than 1.5 × PN.
Non-compliance may cause damages at the 
controller 

.

Filling the System, Start-up 

The pressure 

 behind the valve

must not exceed the pressure 

 before 

the valve.

Non-compliance may cause damages at the 

controller 

.

1.  Open shut-off devices that are possibly 

available at the impulse tubes 

.

2.  Slowly open valves in the system.

3.  Slowly open shut-off device 

.

4.  Slowly open shut-off device 

.

Putting out of Operation

1.  Slowly close shut-off device 

.

2.  Slowly close shut-off device 

.

Setpoint Adjustment 

1. Set-point range see rating plate 

2.  Start-up of system, see section 

.

3.  Start pump 

4.  Observe pressure indicator 

5.  Slightly close fitting 

 behind the pump (in 

flow direction) so that the pressure 

 is rising.

6.  Adjustment of the differential pressure over 

the valve:

•  Turning to the right 

 reduces the set-point 

(unstressing the spring - tension spring) 

•  Turning to the left 

 increases the set-point 

(stressing the spring)

7.  If the required pressure 

 cannot be set, 

further close the fitting 

.

8.  The set-point adjuster 

 may be sealed.

9.  Release the not yet used pointer 

, move it 

to the set position and fix it with the screw to 
mark setting position

Dimensions 

Flanges: connection dimensi ons acc. to    

 

DIN 2501, seal form C

Summary of Contents for AFPA 2 / VFG 2 DN 15-250

Page 1: ...VFG 2 21 DN 15 250 VFG 22 221 DN 65 250 Operating Guide ENGLISH AFPA 2 VFG 2 21 DN 15 250 VFG 22 221 DN 65 250 www danfoss com Page 7 This document is included in the scope of delivery The latest doc...

Page 2: ...0 Tmax 150 C VFG 22 221 VFG 2 21 DN 15 50 Tmax 150 C MAINTENANCE FREE 3 mm SW13 19 36 46 AF 2 DN 15 50 Tmax 150 C Bellows VFG2 VFG21 AFPA 2 adapter003G1780 Piston VFG22 VFG221 DN 65 250 Tmax 150 C AFP...

Page 3: ...Danfoss 2021 03 3 AQ372053646406en 000101 AFPA 2 VFG 2 21 DN 15 250 VFG 22 221 DN 65 250 SW46 Max 100 120 Nm 30 turns Pull out Hold Fix Release for turn Turn till and AFPA 2 VFG 22 221 DN 65 250 FV...

Page 4: ...AQ372053646406en 000101 4 Danfoss 2021 03 AFPA 2 VFG 2 21 DN 15 250 VFG 22 221 DN 65 250 T 120 C T 120 C T 150 C SW 19 40 Nm SW 13 SW 19 40 Nm 30 Turns 30 Turns AFPA 2 VFG 22 221 DN 65 250 G 1 4 AF...

Page 5: ...1 DN 15 250 VFG 22 221 DN 65 250 EN GJL 250 GG 25 PN 16 PN 25 EN GJS 400 GGG 40 3 PN 40 EN GP 240 GH GS C 25 p 1 3 bar Type AFP 2 Code Nr 003G5650 p 1 3 bar Tmax 150 C Area cm2 80 Turn till end Hold F...

Page 6: ...241 241 H 267 267 304 304 323 323 Size cm2 A HA Weight kg mm 32 175 512 9 80 175 512 9 160 228 512 10 320 295 512 15 630 300 635 36 Total installation height of the controller VFG 22 1 valve AFPA 2 pr...

Page 7: ...lse tube can be connected directly to the valve or to the pipeline Connection to the valve 1 Remove plug at the valve 2 Screw in threaded joint G 1 4 with copper seal Torque 40 Nm or Connection to the...

Page 8: ...73695700 AQ372053646406en 000101 8 Danfoss DHS SDBT SI 2021 03 AFPA 2 VFG 2 21 DN 15 250 VFG 22 221 DN 65 250...

Reviews: