Termix VMTD-IV MIX - 5 Series DS Fully insulated
Pre hand over check list
Description:
Pos.
Page
OK
Remark:
Connection connected correctly
10
All connections tightened
Primary system flushed, through flushing bypass
2 Strainers checked
9
17
Differential pressure controller adjusted
31
19
Clip on actuator removed
69
19
Wiring completed
14-15
Mains connected
Room controller connected and working
Pre payment unit connected and working
Pump setting completed
10
19-20
System properly vented
48
17
UFH stat mounted correctly on heating supply line
60
21
DHW Temperature setting
74
21-22
Heating temperature setting
7
18
Flushing bypass closed
Insulation has been remounted
Date:
Unit No.:
Carried out by: