background image

 

ENGINEERING 

 

TOMORROW 

Page 

3

 of 

4

 

Document number: 700493 REV L  

© Copyright Danfoss | 2019.05  

 

 

Installation of new cable:  
1)

 

Connect  cable  to  connector  (J9)  on  backplane.  Ensure  that  plug  is  inserted  in  correct  polarity  (refer  to 
locating keys on plug and slots in connector). Snap connector retainers into place by gently squeezing.   

2)

 

Ensure that compressor 9-pin connector is clean and free of grease and silicone gel. 

3)

 

Connect cable to the 9-pin connector, tighten screws. 

4)

 

Install earth cable to J11 shield earth terminal on backplane 

5)

 

Wipe 3M Silicon Paste Dielectric Grease liberally over 9D cable/compressor connector to seal from moisture 
ingress (3M part number 08946; purchase locally).  

6)

 

Carry  out  bearing  calibration  if  replacing  one  cable  or  after  replacing  both  cables.  Save  calibration  to 
EEPROM 

7)

 

Replace the service side cover.  

 

 

Reviews: