Rigging/Derigging
Refit the Splay link
During setup, the Splay link of the last cabinet has been removed
and must be refitted to the cabinet. For this purpose, proceed as
follows:
1. Release the Locking pin
[1].
2. Turn the extension tube head
[2] by 90°.
3. Insert the Splay link into the rigging strand
[3].
4. Refit the fixing bolt
[4].
5. Refit and lock the ring cotter
[5].
6. Fold the Splay link back into its park position
[
Þ
] and
reinsert the Locking pin.
d&b Z5456 Rigging manual 1.1 en
15