background image

3

2

Technical certificate/GREENHOUSE «TITAN Arch+ 60»

Description

        The  «TITAN  Arch+  60»  greenhouse  is  designed  to  create  a  favorable  microclimate  for 
growing crops in allotments and family gardens.

The  greenhouse  is  available  in  different  lengths  depending  on  the  buyer’s  choice.  The 

required length of the greenhouse is attained by buying additional boxs with extension inserts. 
Each insert lengthens the standard supply set of the greenhouse by 2 m. The length of the 
standard supply set is 4 m. The height of the installed frame of the greenhouse is 2.1 m.

The frame of the greenhouse is made of galvanized steel pipes and profiles and is assembled 

with screws and nuts. The kit includes everything you need for fixing the glazing. The complete 
set of the greenhouse is glazed at the request of the buyer. The standard supply set requires 
3 sheets of 2.1 x 6 m polycarbonate 4 or 6 mm thick: one 2.1 x 6 m polycarbonate sheet for 
each insert.

The  assembly  and  operation  of  the  «TITAN Arch+ 60»  greenhouse should  
be   carried   out   strictly   in   accordance   with   the   Assembly   manual and  
operating    rules    set    forth    in    the    technical    certificate.    The    technical 
certificate must be kept.

!

Operating rules

Before starting the operation, the greenhouse should be assembled and installed according 

to the assembly manual instructions. When installing the greenhouse by third parties, the buyer 
should check the assembly quality for compliance with the Assembly manual instructions.

Do not install the greenhouse close to buildings and trees from which snow or ice may fall. 

The distance of at least 2 m is recommended.

The greenhouse is designed to withstand the wind speed no more than 24 m/s.
The maximum snow load for the framework occurs when the weight of a snow cover is 60 kg 

per 1 m

2

 of the horizontal surface of the ground. It is necessary to avoid exceeding the snow 

load on the greenhouse: either to remove snow from the greenhouse after each snowfall, or 
remove the greenhouse glazing for winter, or install the sliding panels over all spans of the 
frame and shift them to the lower position for winter.

Technical certificate/GREENHOUSE «TITAN Arch+ 60»

Warranty

Claim submission period is 24 months from the date of purchase.

Cleaning and washing polycarbonate panels

Warranty does not apply to cases if:
1. Installation of the structure in violation of the requirements of the instructions.
2. Violation of the operating rules.
3. Misuse of the structure.
4. The presence of corrosion traces on the cutoffs of parts, because this does not affect the 
performance of the structure.
5. Greenhouse deformations due to excess of snow load stated in the technical certificate of 
the greenhouse.
6. Greenhouse deformations due to soil movement.
7. Floods, hurricanes, and other natural disasters.

1. Rinse the panel with warm water.
2. Wash the panel with a mild soap solution or household detergent and warm water, using a 
soft cloth or sponge to remove dirt.
3. Rinse with cold water and wipe with a soft cloth.

Do not use abrasives or highly alkaline cleaning agents to clean polycarbonate panels. Dry 

wiping of the surface will damage the protective layer of the glazing and shorten its effective 
life.  Do  not  rub  the  surface  of  polycarbonate  panels  with  brushes,  metallic  fabric  or  other 
abrasive materials. When disinfecting a greenhouse from pathogens of fungal and bacterial 
diseases, do not apply sulfur candles to avoid corrosion of the frame.

The manufacturer reserves the right for vent engineering design changes.

Summary of Contents for TITAN Arch+ 60

Page 1: ...19 01 2021 for Greenhouse TITAN Arch 60 Manual...

Page 2: ...3 0 m 4 0 m 2 1 m...

Page 3: ...speed no more than 24 m s The maximum snow load for the framework occurs when the weight of a snow cover is 60 kg per 1 m2 of the horizontal surface of the ground It is necessary to avoid exceeding t...

Page 4: ...2 6 9 2 Doorway post for hinges 2 7 9 1 Doorway post 2 8 10 Doorway tie 2 9 12 Door vertical element for hinges 2 10 12 1 Door vertical element 2 11 12 2 Window vertical element for hinges 2 12 12 3...

Page 5: ...1 53 6 60 bolt 10 54 4 25 screw 16 55 6 washer 20 22 4 Lower end wall arch right 2 23 4 1 Lower end wall arch left 2 24 Inner clamp 15 25 Outer clamp 15 26 End wall clamp 10 27 40x20 clamp 4 28 40x20...

Page 6: ...10 63 M4x12 screw 20 64 4 35 screw 8 65 M4 nut 36 66 32x4 washer 8 67 4 8x19 self drilling screw 22 68 Top metal fastening band 2 69 Bottom metal fastening band 4 70 Profile L 1000 mm 4 71 6 60 bolt 4...

Page 7: ...e not mounted in the subsequent assembly 3 1 2 44 from box 2 2 pc 2 from box 1 1 pc 3 1 51 from box 2 1 pc 3 1 44 from box 2 2 pc 33 from box 2 1 pc 1 from box 1 1 pc 38 12 13 14 15 16 17 18 19 20 20...

Page 8: ...from box 1 2 pc 9 from box 1 1 pc 2 12 13 1 13 1 13 12 1 29 from box 2 2 pc Outer side of the window Outer side of the door 48 from box 2 2 pc 43 from box 2 1 pc 30 from box 2 2 pc 49 from box 2 1 pc...

Page 9: ...3 from box 2 1 pc 1 1 1 4 8 2 8 1 1 4 1 Inner side of the end wall Perforation on the elements from the backside 49 from box 2 1 pc 29 from box 2 2 pc 44 from box 2 1 pc 43 from box 2 1 pc 44 from box...

Page 10: ...pc 7 from box 1 1 pc 9 1 10 9 2 10 34 from box 2 1 pc 9 2 9 1 4 4 4 4 4 1 8 1 8 2 10 9 2 Inner side 44 from box 2 1 pc 49 from box 2 1 pc 43 from box 2 1 pc 29 from box 2 2 pc 49 from box 2 1 pc 44 f...

Page 11: ...ner side 49 from box 2 1 pc 29 from box 2 2 pc 43 from box 2 1 pc 29 from box 2 2 pc 43 from box 2 2 pc 44 from box 2 3 pc 49 from box 2 2 pc 49 from box 2 1 pc 29 from box 2 2 pc 43 from box 2 1 pc 2...

Page 12: ...1 1 2 1 2 1 2 1 2 2 8 2 4 4 4 8 2 8 1 4 4 1 26 from box 2 1 pc 4 4 4 8 2 8 1 8 2 8 1 8 2 8 1 4 4 1 4 4 1 4 4 1 4 4 1 4 4 1 4 4 1 Outer side Outer side 42 from box 2 2 pc 48 from box 2 2 pc 44 from bo...

Page 13: ...23 22 9 15 mm 10 mm 10 m m 50 mm 1 8 m m 44 from box 2 18 pc 44 from box 2 14 pc...

Page 14: ...25 24 44 from box 2 29 pc 44 from box 2 19 pc 44 from box 2 5 pc...

Page 15: ...27 26 10 3 1 1 20 from box 2 1 pc 4 21 from box 2 1 pc 4 21 from box 2 1 pc 4 4 4 4 4 1 1 4 4 1 44 from box 2 1 pc 44 from box 2 1 pc...

Page 16: ...8 11 1 1 3 4 4 4 4 4 4 4 4 4 24 from box 2 1 pc 1 1 44 from box 2 1 pc 44 from box 2 1 pc 24 from box 2 1 pc 24 from box 2 1 pc 44 from box 2 1 pc 44 from box 2 1 pc 44 from box 2 1 pc 24 from box 2 1...

Page 17: ...31 30 12 2 2 2 13 2 2 2 2 4 2 2 2 2 2 40 from box 2 1 pc 47 from box 2 1 pc 4 4 4 25 from box 2 1 pc 4 4 4 2 2 2 2 2 4 4 4 2 2 2 2 2 1 1 3 from box 1 5 pc 1 1 47 from box 2 1 pc 40 from box 2 1 pc...

Page 18: ...33 32 14 15 2 2 2 2 L1 L 2 L1 L2 16 2 2 2 2 2 2 2 2 4 4 4 4 4 2 4 3 from box 1 5 pc 47 from box 2 1 pc 40 from box 2 1 pc 40 from box 2 1 pc 47 from box 2 1 pc...

Page 19: ...10 pc 58 from box EXTENTION 2 pc 2 2 2 2 2 2 2 2 2 2 4 4 4 4 4 4 59 from box EXTENTION 4 pc 2 05 37 from box 2 1 pc 44 from box 2 2 pc 34 35 38 from box 2 1 pc 32 from box 2 1 pc 32 from box 2 1 pc 34...

Page 20: ...side with the inscriptions on the transportation film The other side of the film is transparent Mark the protective side of the sheet in each panel because after removing the transportation film the s...

Page 21: ...from box 2 1 pc 1000 1050 52 from box 2 2 pc 1 05 m 4 pc 1 0 m 20 47 from box 2 12 pc 54 from box 2 12 pc 16 17 from box 1 6 pc 39 from box 2 50 from box 2 1 pc 53 from box 2 1 pc 55 from box 2 2 pc 4...

Page 22: ...22 L1 L1 L2 MOUNTING ON THE FOUNDATION 1000 900 3000 4020 1000 L 2...

Page 23: ...I For more information please visit www dancovershop com l l l l l l l l l l l Dancover A S Lyngevej 16A N rre Herlev 3400 Hiller d Denmark Head office...

Reviews: