Illustration for installation and tensioning for both sides of the roof cover
Hint for tensioning front and rear
folds. Put the ropes in the roof
cover pocket through the rings
and pull hard the ropes. At the
same time tidy rumple on the fold
gradually. When the cover is well
on the folds tie a knot with the
ropes on the rings.
8x9x3x5 used for this illustration
Summary of Contents for ST03810
Page 1: ...21 05 2015 8m Series TITANIUM TENT...
Page 5: ...21 05 2015 Part drawings for 8m series Titanium...
Page 6: ......
Page 7: ......
Page 8: ...Figure 2 Figure 3 Figure 4 8x16 2x3x5m 8x9x3x5m...
Page 9: ......
Page 10: ......
Page 12: ......