background image

USER’S IMPORTANT INFORMATION

Proper use of the garden tunnel is provided by correct assembly as per the manufacturer’s instructions:

1. The tunnel must be carefully assembled, as per the guidelines in the manual.

2. All elements of the tunnel construction should be carefully secured with tacks in the connections from all sides

3. The foil should be assembled on sunny and windless days, which will make the work considerably easier. Firm

4.

During winter periods garden foil should be removed from the construction.

strengthen the tunnel by sticking metal or wooden poles and fasten them to the bows.

6. In longer tunnels additional reinforcement of the whole construction is recommended, through connection of

particular bows in their upper part with the use of an additional tube or a thick wire (the so-called ridge lath)

7. The tunnel’s construction may additionally be reinforced using polypropylenic string that will be winding crossly the

tunnel’s surface and that will be fastened to the metal hooks at the ground.

8. Don’t leave the tunnel opened at strong wind, because it may cause the damage of particular parts of the tunnel.

9. One should not attach the strings supporting the plants to the bows, because it may cause the damage of particular

parts of the tunnel.

10. The garden tunnel should not be placed in the open space. It should be placed near the buildings or trees and

bushes.

11. During the assembly the ambient temperature should not be lower than 10°C.

THE MANUFACTURER is not responsible for improper use of the tunnel, other than intended use and for the 

damages that occurred as a result of extreme weather conditions, such as strong wind, hailstorm, snow etc.

Internal layer ensures increased thermal insulation properties, which results in keeping greater amount of thermal 

radiation inside the tunnel.

External layers ensure:

proper elasticity, increased durability and resistance to damages and perfect permeability of light.

Advantages of three-layered foil

- perfect mechanic durability (addition of metallocene)

- perfect permeability of daylight

- high elasticity and resistance to low temperatures

- ensuring the greenhouse effect

Three-layered foil

THE COMPONENTS OF TUNNEL CONSTRUCTION 

Corner T-piece

T00001

4 pcs

Tunnel T-piece 

32/32/90

T00005

28 pcs

Tunnel T-piece 

32/32/67

T00030

8 pcs

Tunnel elbow 

32/90

T00002

8 pcs

Tunnel hinge

T00006

6 pcs

The door frame

T00078

2 pcs + 

2

2 nuts

Four-way tunnel 

piece

T00004

5 pcs

The pin to foil

T00008

72 pcs

Connecting 

tube 

Ø

 28 x 0,2 m

T00033

8 pcs

Tacks

1 op

Assembly pins

6 pcs

* length tolerance of the tubes is within ± 1 cm

1,98 m

the tunnel’s length

T00064

2 pcs

1,77 m

door frame hei

gh

t

T00063

4 pcs

1,68 m

door crossbar

T00077

2 pcs

1,65 m

bows

T00062

9 pcs

1,58 m

door height

T00061

4 pcs

1,10 m

the tunnel’s width

T00058

4 pcs

0,96 m

horizontal elements

T00056

10 pcs

0,88 m

width over door frame 

T00054

2 pcs

0,79 m

door width

T00053

4 pcs

0,60 m

door frame 

T00051

4 pcs

Reviews: