Assembly instructions
middle bows (6 pcs)
external
middle bows (6 pcs)
internal
3
m
0,96
m
0,96
m
0,86
m
1,10 m
1,14 m
8,40 m
1,98 m
1,98 m
0,2 m
1,14 m
1,14 m
1,14 m
1,14 m
1,
50 m
1,50 m
0,
2 m
1,98 m
1,98 m
0,2 m
0,2 m
0,2 m
0,45 m
0,2 m
1,77 m
1,77 m
0,2 m
1,77 m
0,2 m
1,77 m
1,77 m
0,2 m
1,77 m
0,2 m
1,77 m
1,65 m
0,2 m
1,65 m
x 10
x 8
x 30
x 4
x 16
A
A
A
A
A
A
A
A
B
B
Scheme 2a
Scheme 2b
1,77m x54
0,20m x2
C
C
0,78 m
0,84 m
0, 84 m
0,78 m
0,90 m
5,07 m
5,31 m
C
middle bows(6 pcs)
x 30
E
D
E
D
E
E
D
E
E
E
E
E
E
E
E
E
E
E
E
E
D
D
E
F
G
H
H
H
H
H
G
G
G
G
G
H
1,20 m
1,20 m
0,79 m
0,79 m
0,845 m
0,845 m
0,825 m
0,825 m
the bow at the front and back of the tunnel (2 pcs)
the bow at the front and back of the tunnel (2 pcs)
2.The tunnel’s bows
1.The tunnel’s frame
Summary of Contents for Polytunnel Greenhouse 3x8m
Page 1: ...Manual for Polytunnel Greenhouse 3x8 4x1 9m 23 01 2019...
Page 7: ......