background image

Side 6

 

 Instruction manual 

| 4 / 8 | 

 

Roof plates 

4. Tagplader

(a) Start monteringen af tagplader i den åbne ende, ved yderkanten af det første spær (det er vigtigt, at lægterne ligeledes

er skåret rene med yderkant af det første spær).

(b) Med 1½ bølges overlæg, placeres 8 tagplader på toppen. Skruerne sættes i midt på pladerne og i samlingerne i hver

lægte.

4. Roof plates

(a) Start the installation of roofing plate at the open end from the top, at the outer edge of the first rafter (it is important

that the battens are also cut clean with the outer edge of the first rafter).

(b) With 1½ corrugation overlay, place 8 roofing sheets on top. The screws are inserted in the middle of the plates and in

the joints in each batten. The screws are mounted in the bottom of corrugation.

NOTE!

 If there are 

LIGHT WINDOWS

, they must be mounted in a top row.

8 Pcs. Roof plate

34 Pcs. Roof screws

Summary of Contents for Livestock

Page 1: ...03 05 2023 Manual for Livestock Shelter 5x6x3 23m...

Page 2: ...o bottom frame 0500 155 5 Pcs Rafters 0500 S T 2 Pcs Gable posts 0500 160 1 Pcs Lifting brackets 0500 173 2 Pcs Straight struts 0500 172 4 Pcs Oblique struts 0500 171 14 Pcs Roof battens 6 m 3856 600...

Page 3: ...gable posts 3 Battens 4 Roof plates 5 Side plates 6 Gable plates 7 Bargeboard 8 Finishing If you have purchased accessories there are instructions for each of these in the following 8 points 1 Wheel...

Page 4: ...rtant The bottom frame must be level and at right angles to make installation easier a b c 2 pcs Gable bottom frames 2 Pcs side bottom frames 4 Pcs Corner angles 4 Pcs Connecter brackets 16 Pcs Bolts...

Page 5: ...det skulle v re sket skal boltene l snes da det ellers er umuligt at f buerne til at st i lod 5 pcs Rafters 2 pcs Gable posts 1 pc Lifting brackets 2 pcs Pushrod 4 pcs Oblique struts 12 x 30mm machin...

Page 6: ...GT at alle l gter er m rket n jagtigt op b Important To avoid skew in the construction which makes it difficult to install roofing sheets it is IMPORTANT that all battens are marked up exactly b 3 Bat...

Page 7: ...ver l gte 4 Roof plates a Start the installation of roofing plate at the open end from the top at the outer edge of the first rafter it is important that the battens are also cut clean with the outer...

Page 8: ...aden d Tagskruer i hver anden b lge b c 16 Pcs Roof plates 212 Pcs Roof screws d a 5 Side plates a The side panels are pushed up under the roof panels This is easily done by lifting the roof plate wit...

Page 9: ...ne ikke v re tilsk ret anvend pladenipler eller vinkelsliber med tynd sk reskive 6 Gable plates a The gable plates are laid out on the ground b The center of the gable is measured and a line is drawn...

Page 10: ...at bruge de ekstra skruer til at sp nde vinkelblikket ekstra fast i den nederste 1 m A B 7 Bargeboard When you start mounting the bargeboard start from the sides and end at the top a Open gable b Clo...

Page 11: ...il dyr a c 8 Finishing a Finally the cottage is now taken off the leveling blocks b The cottage is storm secured with spikes b 1 and b 2 or with concrete bolts on a point foundation b 3 c As mentioned...

Page 12: ...The wheel bracket is mounted on the back of the cabin with assembly brackets and bolts 2 Pcs Mounting brackets 2 Pcs Axles with tires 2 Pcs Connectors 2 Pcs Stop rings 14 Pcs Machine bolts 12x30 mm 4...

Page 13: ...indfarvet med skruerne som p billedet i hver anden b lge 2 corner protector Wait to install the lower bargeboard or remove if it is retrofitting a Important Roof plate and pipe arch must be flush with...

Page 14: ...lperne b Sp rrene monteres p r rbuerne c PORT ER DEN EN DEL AF FORH JELSEN d Andre fokusomr der 3 extra height a Mount the additional posts on the side frame by using machine bolts Next mount the raft...

Page 15: ...en og der saves ud til hj rnebeslag e 4 Interior wood a Saw the battens remember the end at 45 degrees so they fit between the rafters b Mount with 4 pcs 5x100 mm wood screw pr Batten c Remember all p...

Page 16: ...a retrofit Drill 4 holes 12 5 mm in the bottom frame as shown in the accompanying drawing a Fit the 2 vertical u steel posts without tightening them completely The steel post is fastened at the top to...

Page 17: ...ofit Drill 2 holes 12 5 mm in the bottom frame as shown in the accompanying drawing a Start with vertical posts and align the door panels Important The two vertical posts must be perpendicular otherwi...

Page 18: ...s pipe arches b for the structure to be as strong as possible For details about the setup we refer to the first steps a b 1 5 meter extension 1 Pcs Collector rafters 0500 HULX2 2 Pcs Bottom frames 150...

Page 19: ...trin i ops tningen af selve hytten 8 overhang a When retrofitting overhangs the battens are mounted on top of the existing battens b Mount the battens abundantly long and saw off where you end up with...

Page 20: ...ation please visit www dancovershop com Contact information Austria Belgium Croatia Denmark Estonia Finland France Germany Ireland Italy Latvia Lithuania Nederland Norway Poland Portugal Spain Sweden...

Reviews: