8
4.0
Set up arch / frame
4.1
4.1.1
Set up pre-assembled frames in field 2
4.1.2
Push the pipe clamp left / right onto the frame
NOTE: The clamp leg must point inwards
19004
4.1.3
Screw the frame to the longitudinal tube
NOTE: - The nut must point inwards
14008
4.1.4
Set up pre-assembled frames in field 3
4.1.5
Push the pipe clamp left / right onto the frame
NOTE: The clamp leg must point inwards
4.2
Place cross tubes between frames 2 + 3 - use a spirit level and
align the frame
9248
4.2.1
Fix the cross tubes in place in the clamp
14005
14101
4.3
Mount the cross tubes on the opposite side
4.3.1
Repeat steps 4.1.2 to 4.2.1