background image

PART

NO

QTY

Y7

Y9

Y6

Y2

Y10

Y11

Y1

Y3

Y4

Y5

Y8

Y13

4

4

6

6

2

6

2

1

2

1

1

1

4

PC/Glass

N0.1

PART

NO

QTY

99M

J107

PART

NO

QTY

J107

Rubber for walls & roof

(Provided for glass only)

Rubber for walls only

(Provided for glass only)

Rubber

74M

Summary of Contents for GH152230

Page 1: ...11 05 2021 for Greenhouse 2 5x1 89x2 28m Manual ...

Page 2: ...PRODUCT SIZE LxWxH PLEASE READ CAREFULLY BEFORE ASSEMBLY Assembly Instruction 189 X 250 X 228CM ...

Page 3: ...CONTENTS 1 Assembly Advice Page 1 2 Product Features Page 2 3 Parts List Page 3 4 6 Base Assembly Page 9 10 7 Framework Glazing Assembly Page 11 22 5 Roof Vent Assembly Page 7 8 4 Door Assembly Page 5 6 ...

Page 4: ...blanket to avoid any scratches or damages 4 DO NOT climb or stand on the roof Heavy articles should not be leaned against the greenhouse 5 Keep the roof and gutter clear of snow dirt leaves Allowing snow to build up on the roof may damage the product 6 Unlike steel if the paint finish is scratched this will not harm the aluminium underneath 7 When your product needs cleaning use a mild detergent s...

Page 5: ...emove all film immediately after the construction is completed Please ensure that the side with the white film faces outwards 4 This quality greenhouse features self tapping screws to provide strong joints As the name suggests the screws tap their own thread Driving in self tapping screws requires more force than conventional screws A powered screwdriver is therefore recommended SUN POLYCARBONATE P...

Page 6: ...D 1 L10 1 L02A 4 2 L23A L02C 1 L02D 1 L02E 1 L02F 1 L02G 1 1 L23D 3 L05A 4 L05B 6 4 L19 2 L20 2 L21 2 A01 Part NO QTY 2 L11A 2 L12A windowsX2 1 L14 NO Part QTY 3 L16B 2 L15 3 L18A 2 L17 32 Ø4X25 Z01 1 L16A 1 L18B door 8 M4 2X16 Z08 M01 M6 S01 M6X12 152 155 S02 M6X20 3 L07C 2 L06C 1 L09C 2 4 D1 2 PART NO QTY S01 M6X12 16 M01 M6 16 C1 2 L08C 2 4 L23C 24 M4 2X16 Z08 Free Tool Tools Provided D70 ...

Page 7: ...Y9 Y6 Y2 Y10 Y11 Y1 Y3 Y4 Y5 Y8 Y13 4 4 6 6 2 6 2 1 2 1 1 1 4 PC Glass N0 1 PART NO QTY 99M J107 PART NO QTY J107 Rubber for walls roof Provided for glass only Rubber for walls only Provided for glass only Rubber 74M ...

Page 8: ...5 NO Part QTY 1 L15 2 L18A 1 L17 3 Y11 NO Part QTY 16 Ø4X25 Z01 1 L16B 1 L16A L15 L16B L16A L17 L18A Z01 Z01 Z01 L18A Z01 Z01 Z01 Y11 Y11 Y11 ...

Page 9: ...6 NO Part QTY 1 L15 1 L18A 1 L17 3 Y11 NO Part QTY 16 Ø4X25 Z01 2 L16B L15 L16B L16B L17 L18B Z01 Z01 Z01 L18A Z01 Z01 Z01 Y11 Y11 Y11 1 L18B ...

Page 10: ...Y10 Z02 Y10 Z02 Z04 Z04 Z02 A01 Z02 L19 Step 1 Step 2 Step 3 L19 2 L19 1 L20 1 L21 1 A01 Ø4X8 6 2 7 Part NO QTY 1 Y10 Part NO QTY Ø4X16D Z02 1 L11A 1 L12A M4 2X16 Z04 Z08 2 ...

Page 11: ...8 L11A L12A Z08 L11A L12A Z02 L11A is factory fitted to L12A already Two windows are standard ...

Page 12: ...1 a b a b C1 2 L06C L07C L08C L05C L05C L06C L07C L08C L05C L05C GP933 BACK FRONT 511 50 50 511 511 511 100 511 511 511 24 M4 2X16 Z08 About 100mm distance between two Z08 Fix the base before assembly the greenhouse This is the way to fix the base D70 D70 ...

Page 13: ...1 Y11 Y13 Y1 Y4 Y8 Y2 Y2 Y2 Y2 Y2 Y3 Y6 Y7 Y6 Y7 Y7 Y9 Y6 Y2 Y10 Y11 Y1 Y3 Y4 Y5 Y8 Y13 4 4 6 6 2 6 2 1 2 1 1 1 Attention If glass is chosen please seal it with rubber J11 provided after the whole assembly is finished Rubber is not provided if you choose polycarbonate sheet as glazing panel ...

Page 14: ...24 M4 2X16 Z08 L08 L10 L08C 2 L10 1 L08D L10 L01A L01A L01B L01B L08C L08C L08D 1 1 Fix the glazing bars 2 x L01A and 2 x L01B to the cills L10 and L08D 2 x L08C with S01 M01 provided 2 Fix the cills to the base with Z08 using a powered screwdriver See Page No 7 for details ...

Page 15: ...12 PART NO QTY 8 M01 M6 S01 M6X12 8 1 S01 M01 2 S01 M01 L07C 2 2 L23C L07C 1 1 L07C L23C L23C 1 1 2 2 2 2 1 Fix 2 x L07C eaves to L01A L01B using S01 M01 2 Fix 2 x L23C to L01A L01B using S01 M01 ...

Page 16: ... 2 L23A L23A L23A L23D 1 1 2 2 2 3 3 4 4 L02C L02D L02E L02F L02G L02C 1 L02D 1 L02E 1 L02F 1 L02G 1 19 M01 M6 S01 M6X12 20 L05A 4 2 2 4 Fix L02C L02D to cill L10 L02E L02F L02G to cill L08D using S01 M01 Fix bracings 4 x L05A 2 x L23A and 1 x L23D as below using S01 M01 Slide 2 bolts S01 into L02G bolt channel ...

Page 17: ...M01 S01 3 S01 M01 L02A 4 1 2 3 Y2 Y2 Y2 Y2 Y2 Y2 Slide the glazing panel Y2 into positions Fix L02A 4pcs to L08C and L07C using S01 M01 L02A L07C L07C L23C L08C L08C Slide 2 bolts S01 into each L02A bolt channel One is to fix L23C the other is to be used later for fixing L05B ...

Page 18: ...TY 12 M01 M6 S01 M6X12 12 Y6 6 6 L04A L04A L04A L04A L04A L04A 1 2 3 L04A S01X2 L04A 3 1 1 3 2 2 2 2 2 L04A Y6 Y6 Y6 Y6 Y6 Y6 Fix bracings L04A 6pcs as above using S01 M01 Slide the glazing panel Y6 into positions ...

Page 19: ... L04B L04B S01 M01 S01 M01 S01 M01 S01 M01 S01 M01 5 S01X2 L13A 2 Y1 1 Y3 2 Y4 1 Y5 1 Y8 1 Y13 Fix L13A to L02C L02D with S01 M01 Preload the bolts S01 M01 to L02E L02F before sliding the panels into positions Slide 2 S01 into the channel of L04B Fix L04B to L13A using S01 M01 Slide the glazing panels Y1 Y3 Y4 Y5 Y8 and Y13 into positions ...

Page 20: ...1C D 3 4 M01 S01 L01C D 5 1 Preload S01 M01 on L01C and L01D before fixing them to L01A L01B See figue 1 2 2 Bolt L01C and L01D with plate D17 using S01 M01 preloaded And then fix them to L04B and L02G using S01 M01 3 Fix L01C L01D to L02C L02D L02E L02F with the plate D38 using the S01 and M01 preloaded above 4 Fix L01C L01D to L01A L01B using S01 M01 ...

Page 21: ...S01 L02B L02B S01X3 L02B S01 M01 L06C 1 L06C L07C 1 2 3 L02B L06C 1 2 3 2 3 1 Bolt the ridge L06C to L01C L01D using S01 M01 Slide 3 bolts S01 into each L02B bolt channel to be used later Fix glazing bars L02B 4pcs to the eaves and the ridge profiles with S01 M01 ...

Page 22: ...B L05B L05B 1 2 S01 L05B 6 L05B 1 1 2 2 L23C 3 S01 M01 3 Bolt L05B 6 pcs to L02A L02B using the S01 bolt placed in the bolt channel earlier Bolt L23C to L01C L01D with S01 M01 Bolt L23C 2 pcs to L02B using the S01 bolt placed in the bolt channel earlier ...

Page 23: ...2 Y7 4 Y9 4 A03 2 Y9 WINDOW Y9 Y7 Y7 Firstly slide the glazing panel Y9 into the channel of L02B Slide 4 bolts S01 into each L04A bolt channel 2 to be fixed with A03 and another 2 to be fixed with L02B Slide 2 bolts S01 into each L11A and bolt it to L02B using the S01 M01 Slide the glazing panels into positions ...

Page 24: ... S02 M6X20 3 L09C 2 L09C After the panels and windows are in position put some silicone sealant around to avoid leaking water When the panels are completely inserted fix gutter profile L09C Tap it gently into position with a rubber mallet Slide 5 bolts 2 S01 and 3 S02 into L14 bolt channel Bolt L14 to L13A with S02 M01 ...

Page 25: ...nd the other end to L09C through J56L R using the S01 preloaded and M01 Fix the cover caps J90L R carefully with Z04 Fix the cover caps J56L R carefully with Z02 Be careful to ensure that the screws are driven in straight and in the correct position see detail drawings Drill a hole in L01A L01B approximately 3mm diameter and 700mmup from the bottom Fix the J92 downpipebracket with Z08 screws and t...

Page 26: ...I For more information please visit www dancovershop com l l l l l l l l l l l Dancover A S Lyngevej 16A Nørre Herlev 3400 Hillerød Denmark Head office ...

Reviews: