Step #1 --SECURING BASE FLANGES 

Sit the building boxes in the chosen location. Remove all the 

components from packaging to ensure all components are present by 

checking with the Part List. 

Figure 3  Position of Base Flanges 

Begin by determining exact location of the four (4) corners of the building. Mark front 

edge and side-to-side width of assembly on ground. Drive alignment stakes into the 

ground outside of the markings, and draw alignment strings along both ends and sides 

of the building to the dimensions shown in Figure 3. The outline of the strings will 

represent the final location of the base flanges. The initial location of each Corner 

Base Flanges (

5

R & 

5

L) is critical to the alignment and fit of the frame components 

and cover.

Locate the Left Corner Base Flange and Right Corner Base Flange(

5

R&

5

L). Secure 

the base flanges with Stake Pegs (Part #

17

). Measurements shown in Figure 2 are to 

the center of the upright sockets on each Base Flange. 

The Shelter must be secured to a firm surface that can receive and retain augers and 

pegs firmly in position. The shelter should be installed on FIRM GROUND, not on 

SWAMP, SOFT/WET GROUND. The Base Flanges must be secured so they cannot

be moved. Arches are tensioned at their base as they insert into the Base Plate sockets

.

Summary of Contents for Arched PE

Page 1: ...04 09 2014 QJ 4x8x2 5x3 8m Storage tent Arched PE Manual...

Page 2: ...oof as heavy snow can cause the marquee tent to collapse In the event of rain there is a risk of rain puddles building up on top of the roof of the marquee tent Heavy rain puddles can cause the roof t...

Page 3: ...17mm Sockets or Box Wrench Large Flat Head Screwdriver 2lb maul or Sledgehammer 4 Foot Level 14 Step Ladder Stake String for aligning Base Plates Frame Assembly procedure 1 Prepare location and place...

Page 4: ...ing the poly rope that secures the main cover to the bottom rail of the frame assembly should be checked and adjusted as needed The tension on the main cover should be uniform from end and side to sid...

Page 5: ...Lower vertical tube for front and rear door 4 4 l e n a p r a e r d n a t n o r f e d i s e h t r o f m a e B 0 1 4 e b u t t r o p p u s g n i t n a l S 1 1 8 e b u t t r o p p u s g n i t n a l s r...

Page 6: ...Figure 1 Sketch of Model132612 Size W4 L8 H3 8M...

Page 7: ...gure 2 Sketch of parts Part no 1 5 pcs Part no 2 6 pcs Part no 3 6 pcs Part no 8 4 pcs Part no 4 20 pcs Part no 9 4 pcs Part no 10 4 pcs Part no 11 4 pcs Part no 2A 4 pcs Part no 3A 4 pcs 04 09 2014 Q...

Page 8: ...ine of the strings will represent the final location of the base flanges The initial location of each Corner Base Flanges 5R 5L is critical to the alignment and fit of the frame components and cover L...

Page 9: ...ompletely until frame is fully assembled and set in place THE FRONT PANEL FRAME ASSEMBLY Figure 5 Frame Installation for Front Panel Assemble the front panel frame According to Figure 5 connect the en...

Page 10: ...nues Next stand first interior arch up to repeat insertion into Base flanges Figure 7 Immediately after putting first interior arch into place connect Front Arch and Interior arch using Roof Purlin Tu...

Page 11: ...ropes over top of frame as shown in picture below Having another person inside frame on a ladder to assist in getting Roof Cover over frame will insure the cover will go on without any damage Figure8...

Page 12: ...ROOF COVER ON FRAME FRONT TO BACK The roof cover is tensioned from front to back by the rope lacing to grommet flaps inside the main cover inside the unit at both front and rear arches Using the rope...