7.1 Commissioning checks
Before the generator commissioning it is essential to check that:
The installer has issued regular Certification of Conformity
The water plant is regularly filled with the correct level of liquid inside the OPEN or
CLOSED expansion vessel
The hopper is filled with suitable fuel (
see chapter 4
).
The regulation thermostat is set to the maximum temperature value not higher than
90°
C
and on the minimum temperature value not lower than
60°C
1. Fill the burner with fuel as indicate in
chapter 3.4.2
of the electronic board manual
2. Check, by opening the front door, that the combustibile level is at the base of the igni-
tion plug (
fig. 7.1
)
7.2 Start-up
7. START-UP, IGNITION AND CHECKING
4. Switch off the main switch and set the control board on automatic functioning as sta-
ted in
chapter 3.4.3
of the control board manual.
Fig 7.1 : CS SMALL 20-40 burner
NOTE: CS SMALL 60-100 burner has different dimensions and shape
than fig. 7.1 but the main principle is the same. The burner has to be
filled with fuel up to the base of the ignition plug.
FUEL LEVEL
The fuel has to reach
the base of the ignition
plug.
5. Close the lower door.
6. The start up procedure activates together with the comburent air fan and the feeding
screw.
7. Regulate the primary and secondary air as indicate in this manual.