Electrical Installation
15
Section 4:
Electrical Installation
CAUTION:
Only qualified individuals should access the electrical components of the display and its
associated equipment. It is the responsibility of the electrical contractor to ensure that all electrical
work meets or exceeds local and national codes.
Daktronics engineering staff must approve all changes or the warranty will be void.
4.1 Installation Overview
Electrical installation for four-sided scoreboards involves routing power and control signal
wiring through separate conduit or wire ways to the scoreboard location, as well as routing
power and signal wiring from section to section.
The diagram shown in
illustrates a typical wired setup between the first scoreboard
section and the control system. Daktronics part numbers are shown in parentheses.
Note:
Control signal cable and some junction boxes are not provided as part of this
system and can be purchased locally or from Daktronics.
Figure 4:
Wired Installation
Summary of Contents for Tuff Sport BB-2102
Page 2: ......
Page 4: ......
Page 10: ......
Page 26: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 56: ...PERIOD B B daktronics DAKTRONICS GUEST HOME ...
Page 60: ......
Page 62: ...PERIOD GUEST HOME HOME PERIOD GUEST B B B B B B ...
Page 64: ...HOME GUEST PERIOD HOME GUEST PERIOD B B B B B B B B ...
Page 70: ......
Page 71: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 86: ......
Page 87: ......
Page 88: ......
Page 89: ......
Page 90: ......
Page 91: ......
Page 92: ......
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ......
Page 97: ......
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 104: ......
Page 108: ......
Page 110: ......