SAFEGUARDING THE POINT OF OPERATION 

ANSI B11.2 - Hydraulic Power Presses - 

Safety Requirements for Construction, Care, and Use 

 
 
It is important that Dake press users have a clear understanding of their responsibility involving the care 
and use of their Dake hydraulic press, including point-of-operation safe guards. Dake strongly 
recommends that Dake press users obtain a copy of the current American National Standard Institute 
(ANSI) B11.2 standard, for a more complete understanding of their responsibilities.  
 
ANSI B11.2 states the following, relative to point of operation safeguarding: 
 
“Normally, only the employer (press user) can determine the requirements of the press productions 
system components, including the dies and methods for feeding. Therefore, the employer is ultimately 
responsible to designate and provide the point-of-

operation safeguarding system.” 

 
The standard also discusses additional responsibilities of the employer. Some of the key responsibilities 
are: 

  The employer is responsible for the safety, use, and care of the hydraulic power press production 

system.  

  The employer is responsible to consider the sources of hazards for all tasks to be implemented on 

the hydraulic power press production system.  

  The employer is required to eliminate, or control identified hazards in the scope of their work activity.  

  The employer is responsible for the training of personnel, caring for, inspecting, maintaining, and 

operating hydraulic press production systems to ensure their competence.  

  The employer is responsible to provide and ensure that point-of-operation safeguarding is used, 

checked, maintained, and where applicable, adjusted on every production operation performed on a 
press production system.  

 
  
 
A complete and current copy of the ANSI B.11.2 standard can be obtained by contacting the following: 

 

American National Standards Institute 

1430 Broadway 

New York, NY 10018 

 

AMT 

– The Association for Manufacturing Technology 

7901 Westpark Drive 

McLean, VA 22102 

 

 

Summary of Contents for Force 50DA

Page 1: ...0 846 3253 www dakecorp com customerservice dakecorp com DAKE SINGLE PHASE DURA PRESS Force 50DA INSTRUCTIONAL MANUAL WARNING Read and understand all instructions and responsibilities before operating...

Page 2: ...D POLICY 4 SAFEGUARDING THE POINT OF OPERATION 5 SPECIFICATIONS 6 SAFETY 7 SET UP 9 PRESS PLACEMENT 9 FILLING THE PRESS WILL OIL 9 WIRING INSTRUCTIONS 10 OPERATION 10 BEFORE FIRST TIME OPERATION 10 MA...

Page 3: ...he repair work completed The standard limited warranty includes repair of the defective component part at no cost to the end user Warranty Process Subject to the conditions hereinafter set forth the m...

Page 4: ...llation or failure to operate or maintain the unit in accordance with the printed instructions provided c Defects or malfunctions resulting from abuse accident neglect or damage outside of prepaid fre...

Page 5: ...by Customer Service a representative will supply a Return Material Authorization RMA number The returned item must have the provided RMA number clearly marked on the outside packaging Any item receive...

Page 6: ...on safeguarding system The standard also discusses additional responsibilities of the employer Some of the key responsibilities are The employer is responsible for the safety use and care of the hydra...

Page 7: ...16 Pressing Speed 11 ipm Width between uprights 44 Max ram to table 41 3 4 Height 94 Base 55 x 36 Weight 3 450 lbs In the space provided record the serial number and model number of the machine This...

Page 8: ...ges in this manual and on your press safety labels Keep safety labels in good condition Replace missing or damaged safety labels Do not alter this press from its original design Do not make repairs or...

Page 9: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 909250 8 REV052019 Label Placement View...

Page 10: ...from any other objects or machines Press should be placed on level floor with base angles touching the floor at all points Use shims where necessary FILLING THE PRESS WILL OIL Fill the reservoir with...

Page 11: ...he leads on the motor must be changed to fit 220 volt 17 2 amps follow the diagram on the motor 2 Install plug and wire that fits the rating on the motor the plug and wire must be rated for the voltag...

Page 12: ...ess well oiled for easier operation Also keep a light film of oil over the entire surface of the ram to prevent rust HYDRAULIC LINES AND FITTINGS If there is ever any maintenance done with the hydraul...

Page 13: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 909250 12 REV052019 ELECTRIC SCHEMATIC...

Page 14: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 909250 13 REV052019 HYDRAULIC SCHEMATIC...

Page 15: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 909250 14 REV052019 EXPLODED VIEW PARTS LIST...

Page 16: ...Dake Corporation 724 Robbins Road Grand Haven MI 49417 www dakecorp com 909250 15 REV052019...

Page 17: ...19 Please contact factory for current prices ORDERING INFORMATION Parts are available for direct purchase from Dake or through a distributor When placing a parts order you will need to provide the par...