background image

TR3 Front Lens Shell

Installation Guide

www.gecurrent.com

© 2021 Current Lighting Solutions, LLC. All rights reserved. GE and the GE monogram are trademarks of the 

General Electric Company and are used under license. Information provided is subject to change without 

notice. All values are design or typical values when measured under laboratory conditions. 
RAIL159 (Rev 03/15/21)  99003749

Installation Steps

Lay down the lamp on a clean workbench 

on its back shell to ensure no scratches on 

the front shell. Remove the 4 top screws 

and pull the front shell off.

Location pin

Using gloves, gently place the new front 

shell on the back shell. Align the lens 

location pin to the location pinhole on the 

back shell.

The lamp is ready to be installed in the field as per Current’s installation instructions.

Verify that the black gasket is well seated 

in the lens.  If required, use your fingers to 

push it in place.

Insert and fasten all four screws into the 

front shell. (Torque between 4 and 5 inch-

pounds).
NOTE: Screw stripping or lower torque may 

cause water to penetrate the lamp.

NOTE: Failure to properly follow these instructions may cause signal to malfunction. 

Pictures are for reference only. Actual lens shape may appear different.

1

3

2

4

Reviews: