
1-9
English
Wires Installation
Figure A
Figure A and Figure B shows the location of cover wire in FH(Y)C unit.
Steps to install power supply wires and wires from outdoor unit.
Remove wire cover by removing 2 screws as shown in Figure C.
Wires will go through the hole as shown in Figure D and E respectively without crossing the height of the hole.
After that, wire cover will be assembled back to close the wire.
1.
2.
3.
Figure B
Figure C
Figure D
Figure E
EN CKE-0911(0)DK(saso).indd 9
12/6/11 3:05:08 PM