background image

 

Installation and operation manual

4

FXFQ20~125M7V1B

VRV System air conditioners

4PW15109-1

Check the pipe connector for gas leaks, then insulate it as
shown in the figure below.

If the refrigerant gas leaks during the work, ventilate the area. A
toxic gas is emitted by the refrigerant gas being exposed to a fire.

Finally make sure there is no refrigerant gas leak. A toxic gas
may be released by the refrigerant gas leaking indoor and being
exposed to flames from an area heater, cooking stove, etc.

D

RAIN

 

PIPING

 

WORK

Rig the drain piping as shown in figure and take measures against
condensation. Improperly rigged piping could lead to leaks and
eventually wet furniture and belongings.

1.

Install the drain pipes.

Keep piping as short as possible and slope it downwards so that
air may not remain trapped inside the pipe. 

Keep pipe size equal to or greater than that of the connecting
pipe (Vinyl pipe of 25 mm nominal diameter and 32 mm outer
diameter).

Insert the supplied drain hose into the drain socket, up to the
white tape.

Tighten the clamp until the screw head is less then 4 mm from
the hose. 

Insulate the drain hose inside the building.

If the drain hose cannot be sufficiently set on a slope, fit the hose
with drain raising piping (field supply). 

How to perform piping 

(See figure 8)

1

Connect the drain hose to the drain raising pipes, and insulate
them.

2

Connect the drain hose to the drain outlet on the indoor unit, and
tighten it with the clamp.

Precautions

Install the drain raising pipes at a height of less than 550 mm.

Install the drain raising pipes at a right angle to the indoor unit
and no more than 300 mm from the unit.

2.

After piping work is finished, check if drainage flows
smoothly.

Open the water inlet lid, add approximately 2 l of water gradually
and check the drainage flow.

Method of adding water. See 

figure 13

.

When electric wiring work is finished

Check drainage flow during COOL running, explained in chapter
"

Test operation

".

When electric wiring work is not finished

Remove the switch box lid and connect the power supply and
remote controller to the terminals.
See 

figure 12

.

Coat here with ether oil or 
ester oil

1

Liquid pipe

2

Gas pipe

3

Insulation for fitting of liquid line 
(supplied with the unit) 

4

Insulation for fitting of gas line 
(supplied with the unit) 

5

Clamps
(use 2 clamps per insulation)

1

Hanging bar

1

Clamp metal (supplied with 
the unit)

2

Drain hose (supplied with 
the unit)

3

White tape (field supply)

1

Ceiling slab

2

Hanger bracket

3

Adjustable range

4

Drain raising pipe

5

Drain hose (supplied with the unit)

6

Clamp metal (supplied with the unit)

5

4

2

1

3

1-1.5 m

1

2

1

3

NOTE

The incline of attached drain hose should be
75 mm or less so that the drain socket does not
have to stand additional force.

To  ensure a downward slope of 1:100, install
hanging bars every 1 to 1.5 m.

If unifying multiple drain pipes, install the pipes as
shown in 

figure 9

.  Select converging drain pipes

whose gauge is suitable for the operating capacity
of the unit.

1

T-joint converging drain pipes

1

Portable pump

2

Drain pipe

3

Service cover

4

Inspection opening

5

Service drain outlet (with rubber plug) (Use this outlet to drain 
water from the drain pan)

6

Plastic watering can (Tube should be about 100 mm long.) 
(Adding water through air discharge outlet)

7

Bucket (Adding water from inspection opening)

1

Switch box lid (1)

2

Power supply

3

Power supply terminal board

4

Rubber bush A

5

Clamp A

6

Switch box lid (2) with wiring diagram label

7

Transmission wiring

8

Terminal board for transmission wiring

9

Rubber bush B

10

Clamp B

11

Outside of the unit

12

Inside of the unit

13

Cable (power supply or transmission wiring)

14

Opening for the cable

15

Small sealing (supplied with the unit)

Summary of Contents for XFQ20M7V1B

Page 1: ...INSTALLATION AND OPERATION MANUAL FXFQ20M7V1B FXFQ25M7V1B FXFQ32M7V1B FXFQ40M7V1B FXFQ50M7V1B FXFQ63M7V1B FXFQ80M7V1B FXFQ100M7V1B FXFQ125M7V1B System air conditioner ...

Page 2: ...890 840 780 5 6 7 8 680 840 860 910 950 12 12 3 5 10 1 8 6 7 11 12 15 4 2 14 7 9 13 4 4 1 840 910 840 910 1 4 2 5 6 3 860 860 910 20 20 35 35 6 6 1 2 3 4 7 7 8 3 1 4 6 7 5 2 8 8 5 75 550 750 220 300 mm 1 1 5 mm 1 2 3 4 5 6 9 9 100 mm 1 10 10 2 5 1 4 3 4 3 11 11 1 3 2 1 10mm 13 13 3 2 5 4 1 7 6 100 ...

Page 3: ...F1 F2 T1 T2 LN LN P1 P2 P1 P2 F1 F2 T1 T2 3 4 2 1 20 20 S M S S M 2 3 1 17 17 18 18 IN D OUT D F1 F2 F1 F2 Control box IN D OUT D F1 F2 F1 F2 Control box L N P1 P2 LN P1 P2 F1 F2 T1 T2 1 3 6 2 16 16 L N IN D OUT D F1 F2 F1 F2 Control box LN P1 P2 P1 P2 F1 F2 T1 T2 LN P1 P2 F1 F2 T1 T2 LN P1 P2 F1 F2 T1 T2 LN P1 P2 F1 F2 T1 T2 P1 P2 P1 P2 2 4 5 3 1 19 19 F2 T1 T2 FORCED OFF 1 ...

Page 4: ...de standard er eller andra normgivande dokument under förutsättning att användning sker i överensstämmelse med våra instruktioner respektive utstyr er i overensstemmelse med følgende standard er eller andre normgivende dokument er under forutssetning av at disse brukes i henhold til våre instrukser vastaavat seuraavien standardien ja muiden ohjeellisten dokumenttien vaatimuksia edellyttäen että ni...

Page 5: ...tomers request and install in an appropriate place Refer to catalogues and technical literature for selecting a suitable remote controller A decoration panel is also required for this indoor unit For the following items take special care during construction and check after installation is finished FXFQ20M7V1B FXFQ40M7V1B FXFQ80M7V1B FXFQ25M7V1B FXFQ50M7V1B FXFQ100M7V1B FXFQ32M7V1B FXFQ63M7V1B FXFQ...

Page 6: ...uspension bolts for installation Check whether the ceiling is strong enough to support the weight of the indoor unit If there is a risk reinforce the ceiling before installing the unit The installation pitch is marked on the paper pattern for installation Refer to it to check for points requiring reinforcing Space required for installation see figure 2 air flow direction PREPARATIONS BEFORE INSTAL...

Page 7: ...s tilted against condensate flow the float switch may malfunction and cause water to drip Check if the unit is levelled at all four corners with a water level or a water filled vinyl tube as shown in figure 15 5 Remove the paper pattern for installation For new ceilings only REFRIGERANT PIPING WORK For refrigerant piping of outdoor unit refer to the installation manual supplied with the outdoor un...

Page 8: ...f water gradually and check the drainage flow Method of adding water See figure 13 When electric wiring work is finished Check drainage flow during COOL running explained in chapter Test operation When electric wiring work is not finished Remove the switch box lid and connect the power supply and remote controller to the terminals See figure 12 Coat here with ether oil or ester oil 1 Liquid pipe 2...

Page 9: ... pressing After the connection tighten clamp A as before Unit wiring and remote controller wiring Remove the switch box lid 2 and pull the wires inside through the rubber bush B and connect to the terminal board for unit transmission wiring After connection Attach the small sealing supplied with the unit around the cables to prevent infiltrating of water from the outside into the unit If two or mo...

Page 10: ...ns 3 Do not ground the equipment on gas pipes water pipes lightning rods or crossground with telephones Improper grounding could result in electric shock FIELD SETTING Field setting must be made from the remote controller in accordance with the installation condition Setting can be made by changing the Mode number FIRST CODE No and SECOND CODE No For setting and operation refer to the Field settin...

Page 11: ...alized control INSTALLATION OF THE DECORATION PANEL Refer to the installation manual attached to the decoration panel After installing the decoration panel ensure that there is no space between the unit body and decoration panel Otherwise air may leak through the gap and cause dewdrop TEST OPERATION Refer to the installation manual of the outdoor unit The operation lamp of the remote controller wi...

Page 12: ...TER SIGN RESET button The TIME TO CLEAN AIR FILTER display disappears For details refer to the operation manual of the outdoor unit How to clean the air outlet and outside panels Clean with a soft cloth When it is difficult to remove stains use water or neutral detergent When the blade is extremely contaminated remove it as below and clean or exchange it Blade for exchange is optional How to clean...

Page 13: ...DIODE SERVICE MONITOR RED H2P LIGHT EMITTING DIODE SERVICE MONITOR GREEN H3P LIGHT EMITTING DIODE SERVICE MONITOR RED H4P LIGHT EMITTING DIODE SERVICE MONITOR ORANGE SS1 SELECTOR SWITCH MAIN SUB SS2 SELECTOR SWITCH WIRELESS ADDRESS SET CONNECTOR FOR OPTIONAL PARTS X18A CONNECTOR ADAPTOR FOR ELECTRICAL APPENDICES X23A CONNECTOR WIRELESS REMOTE CONTROLLER FIELD WIRING BLK BLACK TERMINAL BLU BLUE CON...

Page 14: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PWEN15109 1 ...

Reviews: