Field Settings for Outdoor Unit (10/12 HP Models)
SiAF332111E
148
Part 5 Field Settings and Test Operation
4. Field Settings for Outdoor Unit (10/12 HP Models)
This chapter will describe how manual input is possible by operating the BS buttons or DIP
switches on the logic board and reading the feedback from the 7 segment displays.
It is alternatively possible to make several commissioning field setting through a personal
computer interface (for this, option EKPCCAB1 is required). The installer can prepare the
configuration (off-site) on PC and afterwards upload the configuration to the system.
4.1 Capacity Setting
All the DIP switches on the outdoor unit main PCB (A1P) are OFF for factory setting and you
should never change the settings.
Capacity setting is required if the outdoor unit main PCB (A1P) has been replaced with a spare
PCB. Set the positions of the DIP switches as below.
Model
Position (
represents the position of switch.)
RXMQ10ARY1
Turn ON the DIP switches:
DS1-2, DS1-3, DS1-4, DS2-1,
and DS2-2.
RXMQ12ARY1
Turn ON the DIP switches:
DS1-2, DS1-3, DS1-4, and
DS2-3.
ON
OFF
1 2 3 4
DS1
ON
OFF 1 2 3 4
DS2
Initial position
of DIP switches
ON
OFF
1 2 3 4
1 2 3 4
DS1
DS2
ON
OFF
1 2 3 4
1 2 3 4
DS1
DS2
Summary of Contents for VRV S RXQ4/5ARV1
Page 1: ...Service Manual Cooling Only 50 60 Hz RXQ4 5ARV1 RXMQ6ARV1 RXMQ8 10 12ARY1 SiAF332111E...
Page 369: ...SiAF332111E Wiring Diagrams Part 7 Appendix 363 RXMQ6ARV1 C 3D137051...
Page 370: ...Wiring Diagrams SiAF332111E 364 Part 7 Appendix RXMQ8ARY1 C 3D137060...
Page 371: ...SiAF332111E Wiring Diagrams Part 7 Appendix 365 RXMQ10 12ARY1 3D121610B...
Page 375: ...SiAF332111E Wiring Diagrams Part 7 Appendix 369 FXMQ40 50 63 80 100ARV1 3D127112 04 59...