3
|
Components
Service manual
247
REYQ8~20+REMQ5U7Y1B
VRV IV+ Heat Recovery
ESIE18-15B – 2020.05
Phase
Energizing status
1
2
3
4
Ф1
ON
OFF
OFF
ON
Ф2
ON
ON
OFF
OFF
Ф3
OFF
ON
ON
OFF
Ф4
OFF
OFF
ON
ON
▪
Opening sequence for Y2E andY5E:
Valve closing: 8 > 7 > 6 > 5 > 4 > 3 > 2 > 1
Valve opening: 1 > 2 > 3 > 4 > 5 > 6 > 7 > 8
Phase
Energizing status
1
2
3
4
5
6
7
8
Ф1
ON
ON
OFF
OFF
OFF
OFF
OFF
ON
Ф2
OFF
ON
ON
ON
OFF
OFF
OFF
OFF
Ф3
OFF
OFF
OFF
ON
ON
ON
OFF
OFF
Ф4
OFF
OFF
OFF
OFF
OFF
ON
ON
ON
7
Check if the expansion valve is open. Check with a contact thermometer (or by
touching) if refrigerant flows through the expansion valve.
Is the expansion valve open?
Action
Yes
Component is OK. Return to the
troubleshooting of the specific error
and continue with the next step.
No
Replace the expansion valve, see
Problem solved?
After all checking procedures listed above have been performed:
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
Repair procedures
To remove the expansion valve motor
Prerequisite:
Stop the unit operation via the central controller.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
1
If needed, remove any parts or insulation to create more space for the
removal.
2
Cut the tie strap and remove the insulation cap.
Summary of Contents for VRV IV+
Page 473: ......
Page 474: ......
Page 475: ......
Page 476: ...ESIE18 15B 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...