14

8.6.

Leading power line and transmission line

Be sure to let the power line and the transmission line pass
through a conduit hole.

Lead the power line from the upper hole on the left side plate,
from the front position of the main unit (through the conduit hole
of the wiring mounting plate) or from a knock out hole to be
made in the unit's bottom plate. 

(See figure 17)

Precautions when knocking out knockout holes

To punch a knockout hole, hit on it with a hammer.

After knocking out the holes, we recommend you paint the
edges and areas around the edges using repair paint to prevent
rusting.

When passing electrical wiring through the knockout holes,
remove any burrs from the knockout hole edges. Wrap the wiring
with protective tape in order to prevent damage to the wires, put
the wires through field supplied protective wire conduits at that
location, or install suitable field supplied wire nipples or rubber
bushings into the knockout holes.

8.7.

Field line connection: transmission wiring

(See figure 18)

The interconnecting wiring between the outdoor units in the
same piping system must be connected to the Q1/Q2 (Out Multi)
terminals. Connecting the wires to the F1/F2 (Out-Out) terminals
results in system malfunction.

The wiring to other systems must be connected to the F1/F2
(Out-Out) terminals of the P-board in the outdoor unit to which
the interconnecting wiring for the BS box or indoor units is
connected.

The master unit is the outdoor unit to which the interconnecting
wiring for the BS unit or indoor units is connected.

Fixing transmission wiring 

(See figure 20)

Inside switchbox

When connecting wires to the terminal block on the PC-board, too
much heat or tightening could damage the PC-board. Attach with
care.

See the table below for the tightening torque of the transmission
wiring terminals.

1

Electric wiring diagram. Printed on the back of the electric box lid.

2

Power wiring and ground wiring between outdoor units (inside 
conduit)
(When the wiring is routed out through the lateral panel.)

3

Transmission wiring

4

Pipe opening

5

Conduit

6

Power wiring and ground wiring

7

Cut off the shaded zones before use.

8

Through hole cover

1

Knockout hole

2

Burr

3

If there are any possibilities that small animals enter the system 
through the knockout holes, plug the holes with packing materials 
(to be prepared on-site).

Use a power wire pipe for the power wiring.

Outside the unit, make sure the low voltage electric
wiring (i.e. for the remote control, between units, etc.)
and the high voltage electric wiring do not pass near
each other, keeping them at least 50 mm apart.
Proximity may cause electrical interference,
malfunctions, and breakage.

Be sure to connect the power wiring to the power
wiring terminal block and secure it as described under

"8.8. Field line connection: power wiring" on page 15

.

Inter-unit wiring should be secured as described in

"8.7. Field line connection: transmission wiring" on
page 14

.

Secure the wiring with the accessory clamps so
that it does not touch the piping and no external
force can be applied to the terminal.

Make sure the wiring and the electric box lid do not
stick up above the structure and close the cover
firmly.

2

3

1

1

Master unit

(a)

(a) The outdoor unit that connect the transmission wiring to the BS unit is the master 

unit of the multi system, while the other units are slave units. (In this figure 
outdoor unit A is the master unit.)
Test operation, on site settings etc. are done by operating the PC-board (A1P) of 
the master unit.

2

Slave unit

(a)

3

Outdoor unit A

4

Outdoor unit B

5

Outdoor unit C

6

Never connect the power supply wire

7

To outdoor unit of other system

8

Use duplex wires (no polarity)

9

BS unit

10

Indoor unit

11

Indoor unit (cooling only)

1

Fix to the indicated plastic brackets using field supplied clamping 
material.

2

Wiring between the units (Outdoor - outdoor) (F1+F2 right)

3

Wiring between the units (Indoor - outdoor) (F1+F2 left)

4

Wiring for multi connection (Q1+Q2)

5

Plastic bracket

6

Field supplied clamps

Screw size

Tightening torque (N•m)

M3.5 (A1P)

0.80~0.96

Summary of Contents for VRV III REMQ8P7Y1B

Page 1: ...INSTALLATION MANUAL REMQ8P7Y1B REMQ10P7Y1B REMQ12P7Y1B REMQ14P7Y1B REMQ16P7Y1B System air conditioner...

Page 2: ...b 300 mm c 10 mm d 500 mm a 50 mm b 100 mm c 50 mm d 500 mm a 200 mm b 300 mm a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm a 200 mm b 300 mm e 400 mm A B C D A...

Page 3: ...0 mm 500 mm 1 1 1 A B 2 2 2 6 7 3 8 F1 F2 F1 F2 Q1 Q2 F1 F1 F2 F2 Q1Q2 F1 F2F1F2 7 TOIN DUNIT TOOUT DUNIT TOMULTIUNIT A1P Q1 Q2 A1P Q1 Q2 A1P F1 F2F1F2 TO IN D UNIT TO OUT D UNIT TO IN D UNIT TO OUT D...

Page 4: ...konstrukce A a pozitivn zji t no B v souladu s osv d en m C jak bylo uvedeno v souboru technick konstrukce D a pozitivn zji t no E pou it modul F G Kategorie rizik H Viz tak n sleduj c strana 15 kako...

Page 5: ...Smin Minim l temperat ra zem spiediena pus L C TSmax Pies tin t temperat ra saska ar maksim lo pie aujamo spiedienu PS M C Dzesin t js N Spiediena dro bas ier ces iestat ana P bar Izgatavo anas numurs...

Page 6: ...be combined with Daikin VRV indoor units for air conditioning purposes suitable for R410A The present installation manual describes the procedures for unpacking installing and connecting the REMQ P un...

Page 7: ...10 REYQ30 REMQ14 REMQ16 375 975 REYQ32 REMQ16 REMQ16 400 1040 REYQ34 REMQ8 REMQ10 REMQ16 425 1105 REYQ36 REMQ8 REMQ12 REMQ16 450 1170 REYQ38 REMQ10 REMQ12 REMQ16 475 1235 REYQ40 REMQ12 REMQ12 REMQ16 5...

Page 8: ...ncentration from exceeding allowable safety limits in the event of a refrigerant leak 11 To prevent dripping water to form a puddle underneath the unit install a drain pan available as option kit Make...

Page 9: ...f the foundation must at least be 150 mm from the floor The unit must be installed on a solid longitudinal foundation steelbeam frame or concrete and make sure the base under the unit is larger than t...

Page 10: ...st be installed by a licensed refrigeration technician and must comply with relevant local and national regulations Caution to be taken when brazing refrigerant piping Do not use flux when brazing cop...

Page 11: ...you remove the burrs and paint the edges and areas around the edges using repair paint to prevent rusting When passing electrical wiring through the knockout holes wrap the wiring with protective tape...

Page 12: ...hibited patterns change to pattern 1 or 2 To avoid the risk of oil retention to the outmost outdoor unit always connect the stop valve and the piping between outdoor units as shown in the 4 correct po...

Page 13: ...to malfunction of the outdoor unit 5 Piping length restrictions Make sure to perform the piping installation within the range of the maximum allowable pipe length allowable level difference and allowa...

Page 14: ...m n p 40 m Example unit 8 o 40 m Outdoor unit multi connection piping kit and refrigerant branch kit selection How to select the refnet joint When using refnet joints at the first branch counted from...

Page 15: ...r more the size of the main pipes of the liquid side must be increased Never increase suction gas pipe and HP LP gas pipe sizes Depending on the length of the piping the capacity may drop but even in...

Page 16: ...p valve 10 Liquid line stop valve 11 Refrigerant charge port 12 Valve A 13 Valve B 14 Valve C 15 To BS box or indoor unit 16 Stop valve 17 Service port 18 Field piping 19 Gas flow NOTE Make sure to pe...

Page 17: ...id H E liquid suction liquid R10 Resistor current sensor A4P A8P R31T R33T Thermistor discharge M1C M3C R50 R59 Resistor R90 Resistor current sensor R95 Resistor current limiting S1NPH Pressure sensor...

Page 18: ...grounding Be sure to install an earth leakage breaker One that can handle high frequency electrical noise This unit uses an inverter which means that an earth leakage breaker capable of handling high...

Page 19: ...box lid 2 Power wiring and ground wiring between outdoor units inside conduit When the wiring is routed out through the lateral panel 3 Transmission wiring 4 Pipe opening 5 Conduit 6 Power wiring and...

Page 20: ...from cutting the wires 1 Outdoor unit 2 Indoor unit 3 Main line 4 Branch line 1 5 Branch line 2 6 Branch line 3 7 No branch is allowed after branch A Transmission wiring between outdoor unit and indo...

Page 21: ...page 5 The electrical work 1 Make sure there is no faulty power wiring or loose nuts See 8 Field wiring on page 11 2 Make sure there is no faulty transmission wiring or loose nuts See 8 Field wiring o...

Page 22: ...e above Refrigerant cannot be charged until all field wiring and field piping has been completed Refrigerant may only be charged after performing the leak test and the vacuum drying The refrigerant ch...

Page 23: ...H1P x OFF BS1 MODE BS1 MODE BS2 SET BS2 SET BS3 RETURN BS1 MODE Adding refrigerant using the automatic refrigerant charging function is recommended When charging a system charging over the permissibl...

Page 24: ...e in heating mode to increase the indoor temperature The unit will automatically select the cooling mode or heating mode for charging Outdoor temperature 0 C DB 43 C DB Indoor temperature 10 C DB 32 C...

Page 25: ...lay on page 21 8 Operation When the following LED display is shown open valve A and close the front panel If the front panel is left open the system can not operate properly during the refrigerant cha...

Page 26: ...a multi system shows which unit is the master unit w slave 1 unit c or slave 2 unit x Only the master unit is connected to the indoor units with interunit wiring c x x w x x x x w Slave unit 1 a c x...

Page 27: ...ake sure to re attach the inspection cover 1 into the switch box cover 2 after the job is finished WARNING ELECTRIC SHOCK Caution when performing service to inverter equipment 1 Do not open the electr...

Page 28: ...or field setting For field setting For test operation For resetting the address when the wiring is changed or when an additional indoor unit is installed LED display Default status before delivery Mic...

Page 29: ...ed indoor units Be sure to turn on the power 6 hours before operation in order to have power running to the crank case heater and to protect the compressor 3 Make the field setting as described in the...

Page 30: ...to ON The indoor unit BS unit and the outdoor unit expansion valves will fully open The H1P LED is on and the remote controller indicates test operation and external control and the operation will be...

Page 31: ...s the following calculate the volume of A B as a single room or as the smallest room 3 Calculating the refrigerant density using the results of the calculations in steps 1 and 2 above If the result of...

Page 32: ...NOTES NOTES...

Page 33: ...2 13 14 15 5 1 7 10 3 2 9 6 6 6 6 7 4 11 8 6 6 6 6 6 6 7 7 9 8 4 11 6 6 1 10 3 2 6 6 6 6 23 18 9 8 1 2 4 3 5 13 14 15 10 7 12 19 2 1 24 6 11 16 17 15 6 5 10 11 12 7 4 9 16 17 3 8 13 14 2 2 1 1 9 22 23...

Page 34: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW37156 1...

Reviews: