![Daikin VRV III REMQ120PBTJ Engineering Data Download Page 106](http://html1.mh-extra.com/html/daikin/vrv-iii-remq120pbtj/vrv-iii-remq120pbtj_engineering-data_2459191106.webp)
Installation
EDUS391004-N
106
Installation of Outdoor Units
11. ADDITIONAL REFRIGERANT CHARGE
AND CHECK OPERATION
The outdoor unit is charged with refrigerant when shipped from the
factory, but depending on the size and length of the piping when
installed, it may require additional charging.
For charging the additional refrigerant, follow the procedure in this
chapter.
And then carry out the check operation.
11-1 Before working
[About the refrigerant tank]
Check whether the tank has a siphon pipe before charging and place
the tank so that the refrigerant is charged in liquid form.
(See the figure below.)
NOTE
•
Always use the proper refrigerant (R410A). If charged with the
refrigerant containing an improper material, it may cause an explosion
or accident.
•
R410A is a mixed refrigerant, so charging it as a gas will cause the
refrigerant composition to change, which may prevent normal
operation.
[Shutoff valve operation procedure]
When operating the shutoff valve, follow the procedure instructed
below.
NOTE
•
Do not open the shutoff valve until
“10. CHECKING OF DEVICE
AND INSTALLATION CONDITIONS”
are completed. If the shutoff
valve is left open without turning on the power, it may cause
refrigerant to buildup in the compressor, leading insulation
degradation.
•
Be sure to use the correct tools.
The shutoff valve is not a back-seat type. If forced it to open, it
might break the valve body.
•
When using a service port, use the charge hose.
•
After tightening the cap, make sure no refrigerant gas is leaking.
With siphon pipe
Other tanks
Stand the tank upright and charge.
(The siphon pipe goes all the way inside,
so the tank does not need be put
upside-down charge in liquid form.)
Stand the tank upside-down and charge.
3P215731-11R
Summary of Contents for VRV III REMQ120PBTJ
Page 1: ...EDUS 391004 N AMERICAS AMERICAS Installation...
Page 24: ...EDUS391004 N REFNET Pipe System Installation of Outdoor Units 23 1P218719...
Page 25: ...REFNET Pipe System EDUS391004 N 24 Installation of Outdoor Units 1P218720...
Page 26: ...EDUS391004 N REFNET Pipe System Installation of Outdoor Units 25 1P218720...
Page 28: ...EDUS391004 N REFNET Pipe System Installation of Outdoor Units 27 1P280278A...
Page 29: ...REFNET Pipe System EDUS391004 N 28 Installation of Outdoor Units 1P280278A...
Page 30: ...EDUS391004 N REFNET Pipe System Installation of Outdoor Units 29 1P280279...
Page 33: ...REFNET Pipe System EDUS391004 N 32 Installation of Outdoor Units 1P218714...
Page 34: ...EDUS391004 N REFNET Pipe System Installation of Outdoor Units 33 1P218714...
Page 35: ...REFNET Pipe System EDUS391004 N 34 Installation of Outdoor Units 1P218715...
Page 36: ...EDUS391004 N REFNET Pipe System Installation of Outdoor Units 35 1P218715...
Page 38: ...EDUS391004 N REFNET Pipe System Installation of Outdoor Units 37 3D071080...
Page 39: ...REFNET Pipe System EDUS391004 N 38 Installation of Outdoor Units 1P280510A...
Page 40: ...EDUS391004 N REFNET Pipe System Installation of Outdoor Units 39 1P280510A...
Page 41: ...REFNET Pipe System EDUS391004 N 40 Installation of Outdoor Units 1P280511A...
Page 42: ...EDUS391004 N REFNET Pipe System Installation of Outdoor Units 41 1P280511A...
Page 113: ...EDUS391004 N Field Setting Installation of Outdoor Units 113 2P281604A...
Page 114: ...Field Setting EDUS391004 N 114 Installation of Outdoor Units 2P281604A...
Page 115: ...EDUS391004 N Field Setting Installation of Outdoor Units 115 2P281604A...
Page 116: ...Field Setting EDUS391004 N 116 Installation of Outdoor Units 2P281604A...
Page 121: ...EDUS391004 N Field Setting Installation of Outdoor Units 121 2P281605A...
Page 122: ...Field Setting EDUS391004 N 122 Installation of Outdoor Units 2P281605A...
Page 124: ...Field Setting EDUS391004 N 124 Installation of Outdoor Units 2P281605A...
Page 129: ......