17
|
Unit installation
Installer and user reference guide
82
RYMA5+RXYA8~20A7Y1B
VRV 5 heat pump
4P749918-1 – 2023.12
17 Unit installation
WARNING
The installation MUST comply with the requirements that apply to this R32
equipment. For more information, see
"16 Special requirements for R32 units"
65].
In this chapter
17.1 Preparing the installation site
Choose an installation location with sufficient space to transport the unit in and
out of the site.
Do NOT install the unit in places often used as work place. In case of construction
works (e.g. grinding works) where a lot of dust is created, the unit MUST be
covered.
WARNING
The appliance shall be stored in a room without continuously operating ignition
sources (example: open flames, an operating gas appliance or an operating electric
heater).
WARNING
The appliance shall be stored as follows:
▪
in such a way as to prevent mechanical damage.
▪
in a well-ventilated room without continuously operating ignition sources
(example: open flames, an operating gas appliance or an operating electric
heater).
▪
in a room with dimensions as specified in
"16 Special requirements for R32
65].
17.1.1 Installation site requirements of the outdoor unit
INFORMATION
Also read the following requirements:
▪
General installation site requirements. See
"2 General safety precautions"
▪
Service space requirements. See Technical data.
▪
Refrigerant piping requirements (length, height difference). See Refrigerant
piping requirements.