
18
|
Piping installation
Installer and user reference guide
80
REMA5+REYA8~20A7Y1B
VRV 5 heat recovery
4P687640-1 – 2022.07
18 Piping installation
CAUTION
See
"3 Specific installer safety instructions"
13] to make sure this installation
complies with all safety regulations.
In this chapter
18.1 Preparing refrigerant piping
18.1.1 Refrigerant piping requirements
NOTICE
The piping and other pressure-containing parts shall be suitable for refrigerant. Use
phosphoric acid deoxidised seamless copper for refrigerant piping.
INFORMATION
Also read the precautions and requirements in the
▪
Foreign materials inside pipes (including oils for fabrication) must be
≤30 mg/10 m.
18.1.2 Refrigerant piping material
▪
Piping material:
phosphoric acid deoxidised seamless copper