
Si71-502
Operation Procedure
Operation Manual
83
Press the programming time button and set the time for stopping or starting the system.
Each time this button is pressed, the time advances or goes backward by 1 hour.
• The timer can be programmed for a maximum of 72 hours.
• Each time when “
” is pushed, the time advances one hour.
Each time when “
” is pushed, the time goes back one hour.
Press the timer on/off button.
The timer setting procedure ends. The display “
” or “
” changes from flashing light
to constant light.
• After the timer is programmed, the display shows the remaining time.
For cancelling the timer operation, push the timer on/off button “
” once again.
The indication disappears.
Note
• When setting the timer off and on at the same time, repeat the above procedure (from “
” to “
”)
once again.
DETAIL EXPLANATION
When you want to stop operation after a desired time,
Example:
Set the time to “8”.
↓
“
” will display.
Stops operation 8 hours after the reservation is complete.
The program will be cleared after the operation stops.
• Set the stop time during operation.
When you want to start operation after a desired time has elapsed
Example:
Set the time to “8”.
↓
“
” will display.
Starts operation 8 hours after the reservation is complete.
The reservation is cancelled after operation starts.
• Set the start time while the unit is stopped.
• The remaining time will count at the same time after reservation is complete.
See the example below if you want to reserve “off after time” and “on after time” at the same time.
For example: (Refer to figure below)
When the timer is programmed to stop the system after 3 hours and start the system after 4 hours, the
system will stop after 3 hours and start 1 hour later.
Example:
• Setting “off after 3 hours” and “on after 4 hours” will
↓
• Operation will stop after 3 hours.
Operation will then start in 1 hour from the time it stopped.
2
3
1
3
8hr
8hr
hr
hr
Summary of Contents for VAM 350GJVE
Page 7: ...Introduction Si71 502 vi 1 1 1 Cautions in Operation and Maintenance...
Page 8: ...Si71 502 Introduction vii...
Page 13: ...General Constructions Si71 502 4 General Constructions...
Page 29: ...Maintenance Si71 502 20 Maintenance...
Page 43: ...Circuit Operations Si71 502 34 Circuit Operations...
Page 103: ...After sales Service Si71 502 94 Operation Manual...
Page 106: ...Si71 502 Appendix Appendix 97 VAM1500GJVE VAM2000GJVE...
Page 107: ...Appendix Si71 502 98 Appendix...